My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (32)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:54:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App. E, Tech Specs. 2
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.02 SEAMING AND TESTING EQUIPMENT <br />A. Seaming <br />1. Approved field seaming processes are hot shoe double fusion welding and extrusion <br />welding, when approved by CERTIFYING ENGINEER. Use double fusion welding as <br />primary method of seaming adjacent field panels. <br />2. CONTRACTOR shall maintain on -site a minimum of two spare operable seaming <br />apparatuses. <br />3. Seaming equipment shall not damage the geomembrane. <br />4. CONTRACTOR may use a hot air device ( "Leister ") to temporarily bond geomembrane <br />panels that are to be extrusion welded. <br />5. CONTRACTOR shall use extrusion welding apparatus equipped with gauges giving <br />temperature of preheat and extrudate at nozzle of apparatus. <br />6. Welding rods or beads used for extrusion welding shall have the same physical properties <br />as that used for the resin used in the manufacture of the type of geomembrane that is <br />being installed at the Cresson Project. <br />7. CONTRACTOR shall use fusion welding apparatus which are self - propelled devices <br />equipped with a gauge indicating temperature of heating element, and a gauge indicating <br />the speed of the welding apparatus. <br />B. Vacuum Testing (for extrusion seam only) <br />The equipment shall consist of the following: <br />1. Vacuum box assembly consisting of. rigid housing, transparent viewing window, soft <br />neoprene gasket attached to bottom of housing or porthole and valve assembly, and <br />vacuum gauge. <br />2. Pump assembly equipped with pressure controller and pipe connections. <br />3. Rubber pressure /vacuum hose with fittings and connections. <br />4. Bucket of soapy solution. <br />5. Wide paint brush, or other means of applying soapy solution. <br />C. Air Pressure Testing (for double fusion seam only) <br />The equipment shall consist of the following: <br />1. Air pump (manual or motor driven), equipped with a pressure gauge, capable of <br />generating, sustaining, and measuring pressure between 25 and 30 psi and mounted on a <br />cushion to protect geomembrane. <br />® 2. Rubber hose with fittings and connections. <br />Section 02776 Page 12 of 22 September 3, 2008 <br />Geomembrane Revision 1 <br />SAProjects \1125E CCV CQA \I - Tech Specs \02776.0.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.