Laserfiche WebLink
A I lk <br />amec <br />3. CONTRACTOR shall protect geomembrane from excessive heat, cold, puncture, cutting, <br />or other damaging or deleterious conditions. <br />4. CONTRACTOR shall ensure personnel responsible for loading, transport and unloading of <br />geomembrane are fully aware of the consequences of damage to geomembrane, and are <br />familiar with handling and transport constraints imposed by MANUFACTURER. <br />B. Acceptance at Site <br />CQA Monitor shall perform inventory and surface inspection for defects and damage of all <br />geomembrane rolls upon delivery. <br />2. CONTRACTOR shall unroll and inspect any geomembrane roll that may be damaged <br />below surface. <br />3. CONTRACTOR shall repair damage resulting from handling and transport of <br />geomembranes at no additional cost to CC &V. If irreparable, in the opinion of <br />CERTIFYING ENGINEER, damaged materials shall be replaced at no additional cost to <br />CC &V. <br />C. Storage and Protection <br />1. MANAGER will provide area for on -site storage of the geomembrane rolls from time of <br />delivery until installation. <br />2. The storage and handling of the materials is the responsibility of CONTRACTOR from the <br />time the materials are manufactured until the time the completed installation is accepted. <br />CONTRACTOR is responsible for preparing the storage location and for the protection of <br />the materials from the elements (e.g. ultraviolet light, moisture, temperature, etc.). <br />3. After CONTRACTOR has removed material from storage, CONTRACTOR shall protect <br />geomembrane from puncture, dirt, grease, water, moisture, mud, mechanical abrasion, <br />excessive heat, and other sources of damage. <br />4. CONTRACTOR shall preserve integrity and readability of the geomembrane roll labels, <br />and store the rolls such that MANAGER and CERTIFYING ENGINEER have access to <br />the package slips or roll labels for each roll to verify roll acceptance. <br />5. The rolls shall be stored on a prepared surface (not wooden pallets) and should not be <br />stacked more than two rolls high. <br />1.05 SITE CONDITIONS <br />A. Geomembrane Deployment <br />Do not proceed with deployment at an ambient temperature below 14° F or above 100° F <br />unless otherwise authorized, in writing, by MANAGER, DESIGN ENGINEER, and <br />CERTIFYING ENGINEER. Temperature monitoring shall be performed by the CQA <br />Monitor. <br />2. Do not deploy during precipitation, in the presence of excessive moisture (e.g. fog, dew), in <br />an area of ponded water, or in the presence of excessive winds. <br />Section 02776 Page 6 of 22 September 3, 2008 <br />Geomembrane Revision 1 <br />SAProjects \1125E CCV CQA \I - Tech Specs \02776.r1.doc <br />