Aft <br />ame <br />the intended use, CONTRACTOR shall replace the unsatisfactory equipment with other <br />types or adjust methods until proper compaction is achieved. Prior to <br />placement of a subsequent lift, the previous lift shall be thoroughly scarified to a nominal <br />depth of 2- inches to provide good bonding between lifts. Scarification shall be <br />accomplished by disking, raking with a grader, or an alternative method approved by <br />CERTIFYING ENGINEER. <br />10. The CQA Monitor will measure the ambient air temperature on an hourly basis. If the <br />ambient air temperature is less than thirty -two degrees Fahrenheit for more than one hour (1) <br />over the preceding twenty -four (24) hours, the CQA Monitor will measure the temperature <br />of the fill to determine if the fill is frozen. "Frozen' is defined as a mean temperature of <br />thirty-two degrees Fahrenheit (32 °F) or less. The CQA Monitor will measure the <br />temperature at a depth of three (3) inches and six (6) inches, recording the lower of the two. <br />Six (6) measurements will be taken per acre, and if the average is below thirty-two degrees <br />Fahrenheit (32 °F), the fill will be considered frozen. If the fill is determined to be frozen the <br />CONTRACTOR may either remove and replace the frozen fill or wait until subsequent <br />temperature monitoring indicates the fill is unfrozen, at no cost to CC &V. <br />11. Overburden slopes shall be compacted using a method specification and graded to meet the <br />grades and dimensions shown on the DRAWINGS. The Bedding Fill subgrade surface will <br />be prepared as identified in Section 2200 of the SPECIFICATIONS. <br />B. Structural Fill <br />1. Areas to receive Structural Fill will include, but are not limited to, slope reductions, and <br />miscellaneous site grading. <br />2. CONTRACTOR shall condition Structural Fill to a moisture content that allows <br />compaction to the required density and that results in a firm, unyielding surface capable of <br />allowing the movement of vehicles and equipment over the surface without causing rutting <br />or other deleterious effects. <br />3. CONTRACTOR shall place Structural Fill materials with less than 30 percent rock <br />materials above 3/4 -inch size in maximum 12 -inch loose lifts, and compact to 95 percent of <br />maximum dry density (ASTM D698). <br />4. CONTRACTOR shall condition, place and compact Structural Fill containing more than <br />30 percent rock materials above 3/4 -inch size(rock fill) by a method compaction technique. <br />The compaction equipment shall consist of a minimum 10 -ton (static drum weight) vibratory <br />smooth-drum compactor. The number of passes and loose lift thickness shall be subject to <br />CERTIFYING ENGINEER's approval, at no additional cost to CC &V. The method <br />SPECIFICATIONS may be changed at any time, at the discretion of CERTIFYING <br />ENGINEER, based upon changes in material characteristics, field conditions, and/or <br />compaction equipment. <br />Maximum rock size for rock fill shall be two -thirds of the compacted lift thickness, unless <br />otherwise approved by MANAGER, DESIGN ENGINEER, and CERTIFYING <br />ENGINEER. CONTRACTOR shall remove oversize materials from fills at no additional <br />cost to CC &V. <br />0 C. Select Structural Fill <br />Section 02200 Page 9 of 18 September 3, 2008 <br />Earthworks Revision 1 <br />SAProjects \1125E CCV CQA \I - Tech Specs \02200.r1.doc <br />