My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:54:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App. E, Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
performed by the CQA Monitor on -site or in a geotechnical laboratory approved by the CERTIFYING <br />ENGINEER. <br />6.01 CONSTRUCTION TESTING: <br />During construction, the CQA Monitor shall test all earthwork components to verify that the construction is in <br />accordance with the SPECIFICATIONS. Testing shall be performed on all soil used in the construction to <br />confirm the materials meet SPECIFICATIONS. The CQA Monitor shall conduct testing after final placement <br />of the materials. The tests to be performed, and the testing frequency, for each material type are listed in <br />Tables 1 and 2. The testing frequencies specified in Tables 1 and 2 shall be increased when the CQA Monitor <br />determines that construction conditions (such as adverse weather, equipment breakdown, improperly ballasted <br />compactor, excessive lift thickness, improper soil type, improper moisture conditioning and compaction) <br />warrant additional tests. Additional tests will be approved by MANAGER and directed by the CQA Monitor. <br />6.02 CONSTRUCTION MONITORING: <br />The CQA Monitor will monitor and test all earthwork quality assurance components of the construction to <br />verify that the construction is in accordance with the SPECIFICATIONS. The CQA Monitor shall identify <br />inadequate construction methodologies or materials that may adversely impact the performance of the facility <br />being constructed and existing structures. The CQA Monitor will record visual observations throughout the <br />construction process to ensure that the materials are placed to the minimum dimensions as shown on the <br />DRAWINGS. Quality control testing will be performed by the CONTRACTOR. <br />6.02.01 FOUNDATION PREPARATION: <br />0 The CQA Monitor shall observe and document the foundation preparation including: <br />■ stripping and excavation activities to ensure that CONTRACTOR places the material in the <br />appropriate stockpile (Structural Fill, Select Structural Fill, Underdrain Fill, Leak Detection <br />Fill, Low Volume Solution Collection Fill, Bedding Fill, Soil Liner Fill, Drain Cover Fill, <br />Fine Shaft Backfill, Pipe Bedding Material and Granular Filter Material), if stockpiling is <br />necessary; <br />■ stockpiling activities to verify location of stockpile, material type, and dressing; <br />■ excavations for moisture seeps, unsuitable foundation soil, elevation, and proper drainage; <br />■ subgrade preparation to confirm that the surface of the subgrade is free of soft, organic, and <br />otherwise deleterious materials (such as debris, branches, vegetation, mud, ice, or frozen <br />materials); and that soil and rock surfaces that contain joints or fractures are adequately filled <br />in accordance with the SPECIFICATIONS; and <br />■ construction of access roads, drainage control features and erosion control features to verify <br />compliance with the DRAWINGS and SPECIFICATIONS. <br />6.02.02 PLACEMENT OF MATERIALS: <br />During placement of Structural Fill, Select Structural Fill, Coarse Shaft Backfill, Cemented Rockfill, <br />Underdrain Fill, Low Volume Solution Collection Fill, Bedding Fill, Leak Detection Fill, Soil Liner Fill, Drain <br />Cover Fill, Fine Shaft Backfill, Pipe Bedding Material and Granular Filter Material, the CQA Monitor shall: <br />■ verify the use of appropriate fills; <br />Section 01400.1 Page 5 of 9 September 3, 2008 <br />Earthworks CQA Plan Revision 1 <br />SAProiects \1125E CCV CQA \I - Tech Specs \01400.1.r1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.