Laserfiche WebLink
ame <br />Earth & Environmental <br />ATTACHMENT A <br />2009 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF <br />Name <br />OCT -11 <br />OCT -12 <br />OCT -13 <br />OCT -14 <br />OCT -15 <br />OCT -16 <br />OCT -17 <br />Joe Hickey <br />- <br />PR <br />PR <br />PR <br />PR <br />PR <br />- <br />Steve Marquez <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />Tyler Wendlandt <br />- <br />ST <br />ST <br />ST <br />ST <br />- <br />John Lupo <br />- <br />- <br />- <br />- <br />- <br />PCE <br />- <br />Derek Wittwer <br />I <br />I - <br />- <br />I - I <br />- <br />- <br />- <br />Oct. 16 and 17 : AMES had a limited crew on site. Blast pattern drilling, clay processing and fusion <br />welding of pipe for the ADR and Crusher waterlines. <br />LEGEND <br />PS = <br />Project Sponsor <br />PCE <br />= Project Certifying Engineer <br />PM = <br />Project Manager <br />PR = <br />Project Resident <br />LS = <br />Lead Soils Engineer <br />LG = <br />Lead Geosynthetics Engineer <br />ST = <br />Soil Technician <br />LT = <br />Laboratory Technician <br />GT = <br />Geosynthetics Technician <br />VLF Weekly Report WE 10.17.09.D.doc <br />