Laserfiche WebLink
ame0 nim 11 nmm�nmulni <br />Completed Phase 5 VLF Underground Workings <br />11 @1/2009 <br />IDp <br />Northin <br />Eastin <br />Elevation <br />Comments <br />3007 <br />52251.160 <br />37816280 <br />9738.900 <br />Remediation Com <br />3004 <br />51832.108 <br />38288.165 <br />9758A65 <br />Remediation Com <br />3002 <br />50199.458 <br />40213.6]0 <br />10174.951 <br />Workin not within the Phase 5 VLF foo riot. No remetlialion neoessa <br />3003 <br />49881.855 <br />39111.850 <br />10222.514 <br />Workin not w9hin Me Phase 5 VLF k dot. No ramediation necessa <br />3005 <br />49798.380 <br />39013.070 <br />10132.900 <br />Workin removed durin cut Remediation Com <br />Pending Phase 5 VLF Underground Workings <br />11/2112009 <br />IDM <br />Nodhin <br />Eeslin <br />Elevation <br />Comments <br />3008 <br />51789.000 <br />37851 200 <br />Pend 9 <br />Woddn will be remetllaled after cut in area is p erformed <br />3007 <br />51847.00 <br />37844.800 <br />Pentlin <br />WoBin will be remetliated after cut in area is pe rformed <br />3008 <br />51979.100 <br />37884.300 <br />Pentlin <br />Workin beckfilktl. Geo rid ca in p ro g ress <br />3009 <br />51870.100 <br />37738.800 <br />Pentlin <br />Workin will be remetliatetl after cut in area is Pe rformed <br />Photo A, <br />PHOTOGRAPHS, WEEK ENDING NOVEMBER 21,2009 <br />0 <br />r r _ <br />SGR,11 /18/09 Remediation of Underground Working 3008, (Thompson Shaft) <br />VLF Weekly Report WE 11.21.09.D.doc <br />