ame <br />Earth & Environmental <br />Blast pattern drilling was performed in the following areas: between stations A0 +00 ( + / -) and <br />A3 +00 ( + / -), approximately 0 to 50 feet left of centerline: between stations H2 +00 ( + / -) and <br />H4 +00 ( + / -), approximately 0 to 80 feet right of centerline; and between stations A8 +00 ( + / -) <br />and A10 +00 ( + / -), approximately 200 to 250 feet left of centerline using two track mounted <br />drill rigs. Blasting was performed in these areas Monday (10/12/2009), Tuesday (10/13/2009), <br />Wednesday (10/14/2009), and Thursday (10/15/2009). <br />I) Material Processing <br />1) South Cresson Clay Processing Area <br />Processing of Soil Liner Fill material resumed at the South Cresson Clay Process. A CAT D -8 <br />dozer, a CAT 320 excavator, and a CAT 966 front -end loader were used to process the <br />material. <br />Location <br />Week <br />tons <br />Cumulative <br />Comments <br />So Cresson Clay Processing <br />9,949 <br />108,862 <br />Squaw Gulch Processing <br />0 <br />35,816 <br />Processing in area complete. <br />Total <br />5 <br />144 <br />I) ADR and Crusher Waterlines <br />HDPE pipe fusing was performed in the Ames lay down yard for the ADR and Crusher waterlines. <br />J) Miscellaneous <br />Demolition of the old maintenance and the old substation foundations continued. <br />III) Underground Workings <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft /Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial during the week. <br />V) VLF Geosynthetics <br />Exposure of the Phase IV geomembrane, at the northeast corner of the facility (approximate stations <br />G13 +00 to G15 +00), was performed using a John Deere 35D excavator. The bulk of the excavation <br />VLF Weekly Report WE 10.17.09.D.doc <br />