My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (35)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (35)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:23 PM
Creation date
12/30/2009 8:54:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App. D, Weekly Reports
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />Earth & Environmental <br />Blast pattern drilling was performed in the following areas: between stations A0 +00 ( + / -) and <br />A3 +00 ( + / -), approximately 0 to 50 feet left of centerline: between stations H2 +00 ( + / -) and <br />H4 +00 ( + / -), approximately 0 to 80 feet right of centerline; and between stations A8 +00 ( + / -) <br />and A10 +00 ( + / -), approximately 200 to 250 feet left of centerline using two track mounted <br />drill rigs. Blasting was performed in these areas Monday (10/12/2009), Tuesday (10/13/2009), <br />Wednesday (10/14/2009), and Thursday (10/15/2009). <br />I) Material Processing <br />1) South Cresson Clay Processing Area <br />Processing of Soil Liner Fill material resumed at the South Cresson Clay Process. A CAT D -8 <br />dozer, a CAT 320 excavator, and a CAT 966 front -end loader were used to process the <br />material. <br />Location <br />Week <br />tons <br />Cumulative <br />Comments <br />So Cresson Clay Processing <br />9,949 <br />108,862 <br />Squaw Gulch Processing <br />0 <br />35,816 <br />Processing in area complete. <br />Total <br />5 <br />144 <br />I) ADR and Crusher Waterlines <br />HDPE pipe fusing was performed in the Ames lay down yard for the ADR and Crusher waterlines. <br />J) Miscellaneous <br />Demolition of the old maintenance and the old substation foundations continued. <br />III) Underground Workings <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft /Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial during the week. <br />V) VLF Geosynthetics <br />Exposure of the Phase IV geomembrane, at the northeast corner of the facility (approximate stations <br />G13 +00 to G15 +00), was performed using a John Deere 35D excavator. The bulk of the excavation <br />VLF Weekly Report WE 10.17.09.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.