E�3i $ �cnwirr�nm;nui; <br />AMEC observed the Phase IV geomembrane exposure constantly. <br />AMEC observed construction of the ADR/Crushing waterlines. <br />AMEC sampled existing soil liner fill from the Phase IVa and Phase IVc recertification areas. <br />AMEC observed subgrade preparation for the Phase IVa recertification area. <br />AMEC observed soil liner fill placement at the Phase IVa recertification area. <br />AMEC inspected encountered underground workings within the Phase 5 VLF. <br />Testing Summary <br />Laboratory testing continues (Particle Size Distribution, Atterberg Limits, and Moisture - Density <br />Compaction testing) for sampled materials. <br />GENERAL PROJECT I TEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Structural fill placement within the Phase 5 VLF footprint will continue. <br />Continue processing soil liner fill at the South Cresson Clay Processing area. <br />Continue subgrade preparation within the Phase 5 VLF footprint. <br />Continue construction of the ADR and Crusher waterlines. <br />Continue exposure of the Phase IVa and Phase IVc geomembrane for re- certification. <br />Install geomembrane for the Phase IV re- certification areas <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC &V.• <br />CC &V held a Weekly Construction meeting on November 3, 2009. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />Daily Safety/Tailgate Meetings: AMEC personnel attended the Ames daily safety meeting held prior to <br />the start of shift. Discussions centered on safety and planned work activities. <br />AMEC: <br />John Lupo onsite to review design issues and inspect areas involved in the issues. <br />VLF Weekly Report WE 11.07.09.D.doc <br />