Laserfiche WebLink
amec <br />Earth & Environmental <br />ATTACHMENT A <br />2009 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF <br />Name <br />OCT -18 <br />OCT -19 <br />OCT -20 <br />OCT -21 <br />OCT -22 <br />OCT -23 <br />OCT -24 <br />Steve Rice <br />- <br />PR <br />PR <br />PR <br />PR <br />- <br />- <br />Steve Marquez <br />- <br />LS <br />LS <br />LS <br />LS <br />- <br />Tyler Wendlandt <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />John Lupo <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Derek Wittwer <br />- <br />- <br />- <br />- <br />- <br />- <br />10/23/2009 and 10/24/2009 : AMES had a limited crew on site. Blast pattern drilling, clay processing <br />and fusion welding of pipe for the ADR and Crusher waterlines. <br />LEGEND <br />PS = <br />Project Sponsor <br />PCE <br />= Project Certifying Engineer <br />PM = Project Manager <br />PR = <br />Project Resident <br />LS = <br />Lead Soils Engineer <br />LG = <br />Lead Geosynthetics Engineer <br />ST = <br />Soil Technician <br />LT = <br />Laboratory Technician <br />GT = <br />Geosynthetics Technician <br />VLF Weekly Report WE 10.24.09.D.doc <br />