Laserfiche WebLink
October 2004 -iii- 043 -2170 <br />Table 8 <br />CQA Laboratory Test Summary, Pipe Bedding Material <br />Table 9 <br />CQA Laboratory Test Summary, Structural Fill <br />Table 10 <br />CQA Laboratory Test Summary, Soil Liner Fill <br />Table 11 <br />CQA Laboratory Test Summary, Drain Cover Fill <br />Table 12 <br />CQA Laboratory Test Summary, Fine Shaft Backfill <br />Table 13 <br />Field Density and Moisture Content Test Summary, Phase IVc OSA Soil Liner Fill <br />Table 14 <br />Soil Liner Fill Depth Verification Summary <br />Table 15 <br />Concrete CQA Laboratory Testing Summary <br />Table 16 <br />Field Density and Moisture Content Test Summary, Phase IVc OSA Pipe Bedding <br />Material <br />LIST OF FIGURES <br />Fi 1 Cresson Project VLF Site Plan <br />Figure 2 Certification Boundary <br />Figure 3 Destructive Sample Test Codes for Extrusion Welds with Leister Heat Seams <br />Figure 4 Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br />LIST OF IFC DRAWINGS' <br />Drawing 2d Phase We Existing Valley Leach Facility Site Conditions Sheet 1 of 2 <br />Drawing 2e Phase We Existing Valley Leach Facility Site Conditions Sheet 2 of 2 <br />Drawing 3 Phase IV Site Geology Map <br />Drawing 4 <br />Drawing 5d <br />Drawing 5e <br />Drawing 6d <br />Drawing 6e <br />Drawing 7d <br />Drawing 7e <br />Drawing 8a <br />Drawing 9c <br />Drawing 10d <br />Drawing 10e <br />Drawing I1 <br />Drawing 12 <br />Drawing 13 <br />Drawing 14 <br />Drawing 15 <br />Drawing 16 <br />Drawing 17 <br />Drawing 24 <br />Phase IV Site Grading General Plan <br />Phase IVc Site Grading Plan Sheet 1 of 2 <br />Phase IVc Site Grading Plan Sheet 2 of 2 <br />Phase IVc Known Underground Workings and Surface Reconnaissance Sheet 1 of 2 <br />Phase IVc Known Underground Workings and Surface Reconnaissance Sheet 2 of 2 <br />Phase IVc Remediation Areas and Cut/Fill Isopach Sheet 1 of 2 <br />Phase IVc Remediation Areas and Cut/Fill Isopach Sheet 2 of 2 <br />Phase IV Permanent Surface Water Diversion Plan and Profile Sheet 1 of 4 <br />Phase IVc Site Survey Control Plan <br />Phase IV c High Volume Solution Collection Piping Layout Sheet 1 of 2 <br />Phase We High Volume Solution Collection Piping Layout Sheet 2 of 2 <br />Phase N Valley Leach Facility Cross Sections <br />Phase fV Underground Working Remediation Details <br />Phase 1V Underdrain Details <br />Phase IV Leak Detection and Erosion Control Details <br />Phase W Surface Water Diversion Details Sheet 1 of 2 <br />Phase N Surface Water Diversion Details Sheet 2 of 2 <br />Phase IV VLF Sections and Details <br />Phase IV High Volume Solution Collection Details <br />;& 1 Only drawings relevant to Phase We Ore Storage Area construction are presented. <br />]:104%217904W4en-QAenrvo-100410 S7170A100.IZIMCcftPeNc m Golder Associates <br />