My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (40)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:53:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App.A, Phase IVc Cert. Doc.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2004 -26- 043 -2170 <br />0 <br />5.0 GEOSYNTHETICS CQC SUBMITTALS <br />Geosynthetics CQC submittals reviewed by Golder included installation personnel resumes, <br />geomembrane resin certificates, geomembrane roll certificates, welding rod certificates, geogrid <br />certificates, and geotextile certificates. Golder's inventory control, summarizing CQC certification <br />received for each roll of geomembrane received for the Phase We composite liner system, is <br />presented in Appendix J -1. All geosynthetic material used as part of the Phase We OSA construction <br />met project specifications. <br />5.1 Geomembrane Installation Personnel Resumes <br />Golder reviewed the resumes of Poly -Flex installation personnel to verify that the installation <br />superintendent and the seaming personnel possessed sufficient experience as required by the project <br />specifications. Review of the installation personnel resumes indicated that key personnel had <br />experience sufficient to meet or exceed project specifications. Geomembrane personnel resumes are <br />presented in Appendix J -2, <br />0 5.2 Geomembrane CQC Documents <br />CQC documents submitted by Poly -Flex included resin supplier certificates and geomembrane <br />manufacturer resin certificates, geomembrane roll certificates, and welding rod certificates. Golder <br />reviewed CQC documents prior to geomembrane placement and verified that the documentation was <br />complete and that the material properties and CQC testing frequency required by specifications were <br />met. <br />5.2.1 Resin CQC Certificates <br />• <br />LLDPE polymer raw material (resin) CQC certificates were provided by the resin manufacturer, <br />Chevron Phillips Chemical Company, at a frequency of one per rail car shipment. Golder reviewed <br />these certificates prior to geomembrane placement. The geomembrane manufacturer also performed <br />density and melt index tests of the resin supplied by Chevron Phillips Chemical Company to verify <br />material properties prior to geomembrane manufacture. The CQC certificates provided by the resin <br />manufacturer are presented in Appendix J -3. <br />:NWU17W 4Wen-Q"tfvaiw4Ww3:tm.Uftu4&Ct rnrvcaoe Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.