Laserfiche WebLink
August 2002 -45- 003 -2203 <br />8.0 CONCLUSIONS <br />40 <br />In accordance with our responsibilities as the Project Engineer and as the Quality Assurance <br />Consultant for construction of the Phase Wa Area, and per the requirements of the various <br />applicable DMG approvals, Golder Associates Inc. (Golder) attests that it observed and <br />performed the required CQA activities during construction of the Phase Wa Area Based on <br />daily communications with Golder personnel, observations made during on -site visits, and <br />review of the laboratory and field test results, Golder attests that the Phase IVa Area was <br />constructed in compliance with the design plans and specifications as described in this <br />document. <br />Sincerely, <br />GOLDER ASSOCIATES INC. <br />Robert Nichols <br />Resident Engineer <br />John F. Lupo, Ph.D., P.E. <br />Senior Project Manager <br />i <br />�ames M. Johnson, P. . <br />Principal <br />RN /JFUJMJ/hc <br />I- N 20 1104001CaMepNo2M2M ..0400.04740M&c Golder Associates <br />