My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (43)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (43)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:52:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App. A, Phase IVa and IVc Certification Documentation
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 2002 -35- 0003 -2203 <br />• 6.0 GEOSYNTHETIC CQA TESTING AND MONITORING <br />The following sections describe the CQA activities performed by Golder for the geomembrane <br />installed in the Phase Wa Area, and the geosynthetics installed in the LDT and Underdrains. <br />In accordance with the Golder CQA Plan, when a Golder monitor observed deficiencies, the <br />monitor determined the nature and extent of the problem and notified Poly -Flex and/or CC &V. <br />When unsatisfactory test results identified a deficiency, Golder performed additional tests to <br />define the extent of the deficient area. Poly -Flex corrected deficiencies to meet the <br />requirements of the specifications, and Golder retested and/or approved the corrected deficiency <br />prior to any additional related work. The following sections include discussions of the <br />deficiencies encountered. <br />6.1 Ore Storage Area Geomembran►e <br />CQA activities conducted by Golder during the installation of the 80 -mil single -sided textured <br />LLDPE geomembrane in the Phase 1Va OSA consisted of the following: <br />► Conformance sampling and testing of the geomembrane; <br />► Observation and approval of the SLF surface prior to deployment of 80 mil <br />single -sided textured LLDPE geomembrane in the OSA; <br />► Observation and documentation of geomembrane deployment, including <br />verifying sheet thickness and overlap and documenting panel layout; <br />► Observation of trial seam sample testing and documentation of results; <br />► Observation and documentation of field seaming; <br />► Identification of destructive seam sample test locations, observation of <br />destructive seam sample testing, and documentation of test results; <br />► Observation and documentation of geomembrane repairs; and, <br />• <br />l: , x mo3xo400W,atp.epoBO2,=uo;.o400.04740w,&c Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.