My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (43)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (43)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:52:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App. A, Phase IVa and IVc Certification Documentation
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 2002 -27- 003 -2203 <br />second layer of geogrid was installed transverse to the first. Six inches of SSF was then <br />placed and compacted. <br />4.2.2 Underdrains <br />Golder verified that the underdrains were constructed as specified, that Ames placed OF a <br />minimum of 3 feet deep and 5 feet wide in the Primary Underdrain, and 2 feet deep and 4 feet <br />wide in the Secondary Underdrains. Golder verified that Ames removed oversi7e and <br />unsuitable material from the UF. Golder verified that Ames installed geotextile in the <br />underdrains and placed a minimum of 6 inches of SSF on the top of the geotextile. <br />4.2.3 Leak Detection Trench <br />Golder verified that the Phase 1Va LDT was a minimum of 1 foot wide by 1 foot deep, and <br />that LDF, geomembrane, geotextile and pipe were installed as specified. Golder also verified <br />that Phase Na LDS was constructed per the design shown on Construction Drawing 14. <br />4.2.4 Subgrade PrepMation <br />Golder monitored subgrade preparation, including verification that Ames compacted the <br />subgrade with a smooth drum vibratory compactor. Golder verified that Ames removed <br />protruding rocks from the subgrade surface prior to SLF placement. Golder verified that the <br />subgrade surface was moisture conditioned, smooth, and unyielding prior to SLF placement. <br />4.2.5 Site Grading <br />Golder monitored site grading. Due to the gradation of the SF used for site grading, the <br />compaction of the fill could not be tested with a nuclear density gauge (that is, the fill had <br />greater than 30 percent by weight larger than three - quarter inch particle size). Golder verified <br />that the maximum particle size of the fill did not exceed 24 inches, and that lifts were no <br />thicker than one and one -half times the maximum particle size. When SF was placed for <br />r•MM03NOaoot aiReyMZ=3nm.oaoo.04740tu.a - c Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.