My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (43)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (43)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:52:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App. A, Phase IVa and IVc Certification Documentation
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 2002 -2- 003 -2203 <br />(OSA). All quantities and testing frequencies presented in this report are current as of <br />August 2002, which represents completion of the Phase Na Area, as detailed in this report. <br />1.2 Construction Quality Assurance /Quality Control <br />Golder provided CQA and CQC monitoring and testing services, and prepared this report <br />describing the monitoring and test results for the Phase 1Va Area activities. As -built drawings <br />and supporting CQA and CQC monitoring and testing documentation are presented in <br />appendices attached to this report. <br />1.2.1 CQA Monitoring of Earthworks <br />Golder provided CQC testing and CQA testing and monitoring of earthworks for the Phase IVa <br />Area. CQA testing and monitoring of earthworks was provided for in =place materials in <br />accordance with the Golder Earthworks CQA Plan. The earthworks material specifications for <br />this project are summarized in Table 1. CQC earthworks testing was provided to support the <br />contractor during the manufacture of materials and prior to material placement. The CQC test <br />results are not included in this report because these tests were intended to assist the contractor in <br />materials preparation rather than record testing. <br />Golder provided CQA laboratory and field testing, and monitored earthworks construction <br />activities as follows: <br />Golder visually monitored and documented the remediation of <br />underground workings in the Phase IVa Area footprint, including <br />verification that Ames excavated underground workings to the minimum <br />specified dimensions and then installed Coarse Shaft Backfill (CSB), <br />Concrete Plug (CP), Cemented Rockfill (CR), Select Structural Fill (S SF), <br />Structural Fill (SF), and geogrid as specified. <br />Golder monitored construction of the Primary and Secondary Underdrains, <br />including verification that Ames excavated trenches to minimum required <br />dimensions and grades, and placed materials as specified. Golder <br />: w=. IOIM OOWcnxepos02ao32203.0400 04740M.u« Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.