Laserfiche WebLink
• BOWIE RESOURCES LIMITED <br />Permit No. 1 1 DL252-7 <br />Initial Approval <br />Page 2 <br />4. Emissions of air pollutants shall not exceed the following limitations (as calculated in the Division's <br />preliminary analysis). Compliance with the annual limits shall be determined on a rolling (12) month <br />total. By the end of each month a new twelve month total is calculated based on the previous <br />twelve months' data. The permit holder shall calculate monthly emissions and keep a compliance <br />record on site for Division review. (Reference: Regulation 3, Part B, III.A.4) <br />Particulate Matter : .............. 2.61 pounds per day, 0.018 tons per month, and 0.22 <br />tons per year <br />PM,o (Particulate Matter<10pm): ... 1.26 pounds per day, 0.0092 tons per month, and <br />0.11 tons per year <br />During the first twelve (12y months of operation, compliance with the daily, monthly, and yearly <br />emission limitations shall be required. After the first twelve (12) months of operation, compliance <br />with only the daily and yearly limitations shall be required. Compliance with the yearly emission <br />limits shall be determined on a rolling twelve (12) month total. <br />The permit holder shall calculate emissions monthly and keep a compliance record on site in order <br />to demonstrate compliance with the above emission limitations. After the first twelve (12) mohths <br />• of operation, the permit holder shall calculate annual emissions by the end of each month. Annual <br />emissions shall be calculated based on the previous twelve (12) months' emission data. These <br />calculated annual emissions shall be used to demonstrate compliance with the yearly emission limit <br />listed above. <br />5. All three silos shall be vented to a baghouse capable of reducing uncontrolled emissions of <br />particulates and PM,p by at least 99.0%. Operating parameters of the control equipment shall be <br />identified prior to final approval of this permit. The identified operating parameters will replace the <br />control efficiency requirement on the final permit. (Reference: Reg.3, Part B,IV.E.) <br />6. Permits 11 DL252-8 and 11 DL252-9 were cancelled upon issuance of the previous version of this <br />permit. <br />7. This source is limited to the following maximum number of hours of operation. A log shall be <br />maintained on site listing the actual number of hours of operation per day, and shall be made <br />available upon request to the Divisian. <br />Hours of operation shall not exceed 20 hours per day. <br />• <br />29/8/1 <br />