My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-30_PERMIT FILE - C1981038A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038A
>
2009-11-30_PERMIT FILE - C1981038A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:16 PM
Creation date
12/29/2009 1:22:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
11/30/2009
Section_Exhibit Name
VOLUME 7 Exhibit 1 Deeds and Water Rights Paonia Loadout
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wr1TEF2 USEF2.S' CONSULTATION <br />• ZNTI~DUCTZON <br />In canpliance with Federal Lease stipulation (d), Colorado Liestmoreland Inc. <br />has formulated a water replacement plan to replace the possible loss of <br />water presently adjudicated and historically F.ut to beneficial use. Luring <br />development of this stipulation, consultation with potentially affected <br />water users and Fi?deral and State authorities was initiated. Further con- <br />sal ration continued after development of water replacement plans. <br />Invitations to water users were sent on the basis of adjudicated or histori- <br />cal beneficial use of water within and adjacent to the permit area. Because <br />water is a property right, not all existing users could be contacted Lx cause <br />State Engineer's records show originators only. The following summaries of <br />meetings are submitted as fulfillment of the requirement to consult with <br />potentially affected water users prior to State approval of the water <br />replace:.~ent plan. <br />The purpJSe of these meetings was to inform interested parties of the <br />general scope and intent of the water replacement plan. The meetings were <br />grouted according to separate basins since the plan proroses specific <br />replacement items as site conditions dictate. <br />Comments were either clarified at the meetings or incorporated into the <br />respective basin's water replacement plan. <br />I• <br />
The URL can be used to link to this page
Your browser does not support the video tag.