Laserfiche WebLink
Step 6e — Provide estimate of total discharge volume (Abatement date 10/13/06 — Completed 10/13/06 - <br />Abated 10/13/06) <br />Step 6f — Submit written report to CDRMS (Abatement date 10/13/06 — Completed 10/13/06 - Abated <br />10/13/06) <br />Step 7 — Submit plans for abatement of potential long -term impacts with schedule and concurrence from <br />jurisdictional agencies (Abatement date 10/10/06 — Completed 09/14/06 except for agency concurrence <br />- Abated 10/06/06) <br />Step 8 — Continue surface water monitoring and submit copy of 3` Quarter DMR to CDRMS (Abatement <br />date 10/30/06 — Completed 10/30/06 - Abated 10/30/06) <br />Step 9a — Reestablish and document temporary stormwater storage and discharge capabilities consistent <br />with approved design ((Abatement date 11/17/06 — Abated 11/17/06) <br />Step 9b — Remove coal fines accumulation from north pond area and dispose of coal fines in existing coal <br />refuse area (Abatement date 01/31/07 — Abated 01/30/07) <br />Step 10 — Submit as -built drawings for Pond E restoration along with documentation of treatment adequacy <br />(Abatement date 02/09/07 — Abated 02/08/07) <br />Step 11 — Submit final clean -up report to CDRMS, CDPHE -WQCD, CDOW, and USACE (Abatement <br />date 02/09/07 — Abated 02/09/07) <br />Final Resolution: The NOV was terminated on February 9, 2007, and TCC submitted payment for the $2,050.00 <br />civil penalty on October 15, 2006. <br />Mine Identification - DMG Permit No. C 82 -056 <br />MSHA ID No. -05- 03836; Issued 1983 <br />Violation Identification: CV - 2006 -004, September 5, 2006 <br />Issuing Regulatory Authority Division of Reclamation, Mining, and Safety <br />Brief Description of Violation Failure to limit disturbance to approved areas — In discharging water and mud from <br />6MN Shaft excavation, shaft contractor splashed material over the edge of the existing drainage control ditch onto <br />adjacent undisturbed area and stream buffer zone. None of the spilled material reached an active drainage. <br />Date, Location and Type of Administrative Proceedings: Notice of Proposed Assessment issued on September 21, <br />2006 for a proposed civil penalty of $250.00. A Notice and Order to Pay Fixed Penalty issued October 5, 2006, and <br />payment was submitted on October 10, 2006. <br />Current Status: NOV terminated on September 5, 2006. <br />Actions Taken to Abate Violation: Actions resulting in spill were addressed through immediate conversations <br />with contractor. Ditch was cleaned -out the day after the inspection (August 24, 2006), and a protective berm was <br />established on the far side of the ditch to provide an additional measure of protection from any material that <br />might splash during discharge to the ditch. The contractor cleaned the minor amount of splashed material from <br />the vegetation adjacent to the ditch by hand. <br />Final Resolution: The NOV was terminated and TCC submitted payment for the $250.00 civil penalty on <br />October 10, 2006. <br />(4) After an applicant is notified that his or her application is approved, but before the permit is issued, <br />the applicant shall, as applicable, update, correct, or indicate that no change has occurred in the <br />information previously submitted under this section. <br />TR09 -68 2.03 -21 07/06/09 <br />