Laserfiche WebLink
sheet 1 of 2 <br />n <br />U <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task # : 076 State : Colorado Permit/job #: C-1981-012 <br />Date : 0112612009 County: Las Animas Abbreviation :none <br />User : JRS Site :New Elk Mine Filename :C012-076 <br />Permit or other job action :Permit Renewal 05 <br />Task description :Replace Topsoil to Refuse Disposal Area Operational Surface <br />HOURLY EQUIPMENT COST <br />• <br />Cost Bre <br />Description <br />Shift basis : 1 per day <br />Scraper work team -Scraper : Cat 627G <br />-Push dozer : Cat D9R - 9SU (2005) <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader :I NA <br />-Water truck lWater Tanker, 5,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 dozer NA NA NA misctruk <br />% Utilization-machine : 100 33 NA NA NA 25 <br />-Ripper attachment : NA 20 NA NA NA NA <br />Ownerhip cost/hour : $55.31 $62.35 NA NA NA $21.89 <br />Operating cost/hour : $122.08 $33.62 NA NA NA $8.68 <br />Ripper op. cost/hour : NA $0.00 NA NA NA $0.00 <br />Operator cost/hour : $24.95 $32.78 NA NA. NA $33.94 <br />Unit subtotals : $202.34 $128.75 NA NA NA $64.51 <br />Number of units : 2 1 0 0 0 1 <br />Group subtotals : Work : $533.42 Support: $0.00 Maintenance : $64.51 <br />Total work team cost/hour : $597.93 <br />LJ <br /> <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 24,930 CCY factor: 1.125 <br />Source of quantity take-off : Page 2.05-46, Maps 15 and 16 <br />Source of estimated swell factor : CAT Handbook <br />RN-05 <br />Exhibit 28-85 <br />Loose <br />volume : 28,046 LCY <br />(Revised 2116109)