Laserfiche WebLink
sheet 1 of 2 <br /> <br /> <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task 075 State : Colorado Permit/job #: C-1981-012 <br />Date : 0112612009 County: Las Animas Abbreviation :none <br />User : JRS Site: New Elk Mine Filename :C012-075 <br />Permit or other job action :Permit Renewal 05 <br />Task description :Replace Topsoil to Topsoil Borrow Area <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bre <br />uipment Description <br />Scraper work team -Scraper : Cat 627G <br />-Push dozer : Cat D9R - 9SU (2005) <br />Support equipment -Load area : NA <br />-Dump area :NA <br />Road maintenance -Motor grader : NA <br />-Water truck : Water Tanker, 5,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 dozer NA NA NA misctruk <br />% Utilization-machine : 95 100 NA NA NA 25 <br />-Ripper attachment : NA 20 NA NA NA NA <br />Ownerhip cost/hour : $55.31 $62.35 NA NA NA $21.89 <br />Operating cost/hour : $116.17 $103.27 NA NA NA $8.68 <br />Ripper op. cost/hour : NA $0.00 NA NA NA $0.00 <br />Operator cost/hour : $24.95 $32.78 NA NA NA $33.94 <br />Unit subtotals : $196.43 $198.40 NA NA NA $64.51 <br />Number of units :111 2 1 0 0 0 1 <br />Group subtotals : Work : $591.27 Support : $0.00 Maintenance : $64.51 <br />Total work team cost/hour : $655.78 <br />r1 <br />U <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 920 CCY factor : 1.125 volume : 1,035 LCY <br />Source of quantity take-off :Page 2.05-46; Maps 15 and 16 <br />Source of estimated swell factor :"CAT Handbook <br />RN-05 Exhibit 28-83 (Revised 2/16/09)