Laserfiche WebLink
HOURLY PRODUCTION <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : <br />Material weight: <br />Material description <br />Earth - Dry packed <br />sheet 2 of 2 <br />2.550 pounds/LCY <br />Rated payload : 48,000 pounds <br />Payload capacity : 18.82 LCY <br />Scraper Bowl (volume) Basis : <br />Struck volume : 15.70 LCY <br />Heaped volume : 21.00 LCY <br />Average volume : 18.35 LCY <br />Adjusted capacity : 18.35 LCY *** <br />' hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 7,500 <br /> Scraper Push dozer Source <br />Scraper loading time 1.50 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />' load time per scraper pair on push-pull models Net correction : 0.830 NA <br />Travel time : <br />Road condition description : Rutted dirt, little maintenance, no water, I" tire penetration <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)' <br />1 700 5.00 4.00 9.00 1249 0.62 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time : 0.62 minutes <br />" travel time for each segment is adjusted for acceleration/deceleration. Return time <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit production/hour : 364.72 LCY/hourAdjusted for job conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly production <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />0.30 minutes <br />3.02 minutes <br />302.72 LCY/hour <br />1 scraper(s) <br />302.72 LCY/hour <br />302.72 LCY/hour <br />1 Team(s) Total job time : 1.71 Hours <br />$0.668 /LCY Total job cost : $346 <br /> <br />0 <br />• <br />RN-05 Exhibit 28-62 (Revised 2/16/09)