Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 050 <br />Date : 0111312009 <br />User: JRS <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal 05 <br />Task description : Regrade All Ditches at East Portal Area <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 8,744 CCY factor : 1.125 volume : 9,837 LCY <br /> <br />Source of estimated volume : Exhibit 19, pages D-1 - D-9; Table 20, Maps 13, 13A, 14 and 24 <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 700.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted rill or embankment Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 0.90. (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,500 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2650 Ibs/LCY Net correction : 0.35 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 245.95 LCY/hr <br /> Adjusted fleet production : 245.95 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 40.00 Hours <br />Unit cost : $0.844 /LCY Total job cost : $8,301 <br />State : Colorado <br />County: Las Animas <br />Site : New Elk Mine <br />Permit/job# : C-1981-012 <br />Abbreviation :none <br />Filename :C012-050 <br /> <br /> <br />RN-05 Exhibit 28-,50 (Revised 2/16/09)