Laserfiche WebLink
HOURLY PRODUCTION <br />Haulinq Capacitv : <br />Scraper Payload (weight) Basis <br />sheet 2 of 2 <br />Scraper Bowl (volume) Basis : • <br />Material weight : 2,900 pounds/LCY <br />Material description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Rated payload : 48,000 pounds <br />Payload capacity: 16.55 LCY <br />Struck volume : 15.70 LCY <br />Heaped volume : 21.00 LCY <br />Average volume : 18.35 LCY <br />Adjusted capacity : 16.55 LCY *** <br />hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 7,500 <br /> Scraper Push dozer Source <br />Scraper loading time 0.40 minutes Altitude adj.: 1.000 1.000 (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 0.830 (Cat HB) <br />* load time per scraper pair on push-pull models Net correction : 0.830 0.830 <br />Travel time : <br />Road condition description :Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 625 -25.00 5.00 -20.00 960 0.85 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : <br />Return route 0.85 <br />1 625 25.00 5.00 30.00 584 1.08 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />" travel time for each segment is adjusted for acceleration/deceleration. Return time : <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : <br />Unadjusted unit production/hour : 339.84 LCY/hour *** Adjusted for job conditions : <br />Optimal number of scrapers per push dozer : 4 Selected number of scrapers : <br />Adjusted single scraper team (unit) hourly production : <br />Adjusted multiple scraper team (fleet) hourly production : <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 1.08 <br /> <br />2.92 <br />282.07 <br />2 <br />564.14 <br />564.14 <br /> <br />219.69 <br />Unit cost : $1.101 /LCY Total job cost : $136,399 <br />minutes <br />minutes <br />minutes <br />LCY/hour <br />scraper(s) <br />LCY/hour <br />LCY/hour <br />LI <br />Hours 0 <br />RN-05 Exhibit 28-32 (Revised 2/16/09)