Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />I? <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task 013 State : Colorado Permit/job #: C-1981-012 <br />Date : 0112612009 County: Las Animas Abbreviation :none <br />User : JRS Site : New Elk Mine Filename : C012-013 <br />Permit or other job action :Permit Renewal 05 <br />Task description : Haul and Spread Cover from RDA to DWP - Reclaimed Bench <br />HOURLY EQUIPMENT COST <br />Cost Bre <br />Description <br />Scraper work team -Scraper :I Cat 627G <br />-Push dozer : Cat D9R - 9SU (2005) <br />Support equipment -Load area :INA <br />-Dump area :NA <br />Road maintenance -Motor grader :I NA <br />-Water truck :Water Tanker, 5,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 dozer NA NA NA misctruk <br />% Utilization-machine : 100 29 NA NA NA 25 <br />-Ripper attachment : NA 20 NA NA NA NA <br />Ownerhip cost/hour : $55.31 $62.35 NA NA NA $21.89 <br />Operating cost/hour : $122.08 $30.44 NA NA NA $8.68 <br />Ripper op. cost/hour : NA $0.00 NA NA NA $0.00 <br />Operator cost/hour : $24.95 $32.78 NA NA NA $33.94 <br />Unit subtotals : $202.34 $125.57 NA NA NA $64.51 <br />Number of units : 2 1 0 0 0 1 <br />Group subtotals : Work : $530.24 Support: $0.00 Maintenance : $64.51 <br />Total work team cost/hour : $594.76 <br />0 <br />Source of quantity take-off :Map 15, Division Estimate <br />Source of estimated swell factor : CAT Handbook <br />RN-05 <br />Shift basis : 1 per day <br />Loose <br />volume : 3,456 LCY <br />Exhibit 28-29 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 2, 765 BCY factor : 1.250 <br />(Revised 2/16109)