My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-18_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2009-09-18_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:31 PM
Creation date
12/29/2009 9:13:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
9/18/2009
Doc Name
Bond Calculations (RN5, TR50 & TR51)
Section_Exhibit Name
Exhibit 28 Appendix B
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task #: 011 <br />Date : 0112612009 <br />User: JRS <br />Data source : (CRG) <br />Utilization % <br />$72.22 NA <br />$103.27 100 <br />$9.99 100 <br />$32.78 NA <br />$218.26 Total fleet cost/hour : $654.79 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal 05 <br />Task description :Rip Cover Material at RDA for DWP <br />HOURLY EQUIPMENT COST <br />State : Colorado <br />County : Las Animas <br />Site : New Elk Mine <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :"Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :1-shank ripper <br />Cost Breakdown : Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour <br />Total unit cost/hour <br />MATERIAL QUANTITIES i <br />Selected estimating method : Seismic <br />Alternate methods - <br />Seismic : 4,444 BCY Load factor : NA <br />Area : NA acres Rip depth (ft) : NA <br />Source of estimated quantity: Map 15, Division Estimate <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic: Seismic velocity : 3,000 feet/second <br />Unadjusted production : 1,820.80 cu. yds./hour <br /> <br />Area : Avg. ripping depth : NA feet/pass <br />Average ripping width : NA feet/pass <br />Average ripping length : NA feet/pass <br />Average dozer speed : NA feet/minute <br />Average maneuver time : NA minutes/pass <br />Production per unit area : NA acres/hour <br />Unadjusted production : NA cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 3 dozer(s) <br />Unit cost : $0.144 per cu. yd. <br />RN-05 Exhibit 28-26 <br />Permit/job # : C-1981-012 <br />Abbreviation :none <br />Filename : C012-011 <br />Bank volume : 4,444 BCY <br />Volume : NA BCY or CCY <br />wI INHIw I vVl I Vl LIUI I I al.lVI J - <br />Unadjusted production <br />per selected method : 1,820.80 cu. yds./hour <br /> <br />Site altitude : 7,500 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />1,511.26 cu. yds./hour <br />4,533.79 cu. yds./hour <br />0.98 hours <br />$642 <br />(Revised 2/16/09)
The URL can be used to link to this page
Your browser does not support the video tag.