My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-18_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2009-09-18_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:31 PM
Creation date
12/29/2009 9:13:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
9/18/2009
Doc Name
Bond Calculations (RN5, TR50 & TR51)
Section_Exhibit Name
Exhibit 28 Appendix B
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : <br />Material weight : 1,600 pounds/LCY <br />Material description : <br />Coal - Bituminous, Raw <br />Rated payload : 48,000 pounds <br />Payload capacity : 30.00 LCY <br />Scraper Bowl (volume) Basis : <br />Struck volume : 15.70 LCY <br />Heaped volume : 21.00 LCY <br />Average volume : 18.35 LCY <br />Adjusted capacity : 18,35 LCY ... <br />'** hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 7,500 <br /> Scraper Push dozer Source <br />Scraper loading time 0.40 minutes Altitude adj.: 1.000 1.000 (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 0.830 (Cat HB) <br />" load time per scraper pair on push-pull models Net correction : 0.830 0.830 <br />Travel time : <br />Road condition description :Firm, smooth, rolling, dirt/It. surfaced, watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)"" <br />1 1,500 2.00 3.00 5.00 2218 0.81 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time : 0.81 minutes <br />travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.62 <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 2.42 <br />Unadjusted unit production/hour : 454.21 LCY/hour *"* Adjusted for job conditions : 376.99 <br />Optimal number of scrapers per push dozer : 3 Selected number of scrapers : 2 <br />Adjusted single scraper team (unit) hourly production : 753.99 <br />Adjusted multiple scraper team (fleet) hourly production : 753.99 <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 7.47 <br />Unit cost : $0.839 /LCY Total job cost : $4,722 <br />sheet 2 of 2 <br />minutes <br />• <br />r? <br />U <br />minutes <br />LCY/hour <br />scraper(s) <br />LCY/hour <br />LCY/hour <br />Hours <br />RN-05 Exhibit 28-20 (Revised 2/16/09)
The URL can be used to link to this page
Your browser does not support the video tag.