Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 006 State : Colorado Permit/job # : C-1981-012 <br />Date : 0112612009 County: Las Animas Abbreviation :none <br />User : JRS Site : New Elk Mine Filename : C012-006 <br />Permit or other job action :Permit Renewal 05 <br />Task description :Haul Southeast Coal Stockpile Footprint to Development Waste Pile <br />HOURLY EQUIPMENT COST <br />Shift basis: 1 per day <br />Equipment Description <br />Scraper work team -Scraper : Cat 627G <br />-Push dozer : Cat D9R - 9SU (2005) <br />Support equipment -Load area :,NA <br />-Dump area :NA <br />Cost Brf <br />ekdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 dozer NA NA NA misctruk <br />% Utilization-machine : 100 58 NA NA NA 25 <br />-Ripper attachment : NA 20 NA NA NA NA <br />Ownerhip cost/hour : $55.31 $62.35 NA NA NA $21.89 <br />Operating cost/hour : $122.08 $59.63 NA NA NA $8.68 <br />Ripper op. cost/hour : NA $0.00 NA NA NA $0.00 <br />Operator cost/hour : $24.95 $32.78 NA NA NA $33.94 <br />Unit subtotals : $202.34 $154.76 NA NA NA $64.51 <br />Number of units : 2 1 0 0 0 1 <br />Group subtotals : Work:- $559.44 Support : $0.00 Maintenance : $64.51 <br />Road maintenance -Motor grader : LNA <br />-Wat <br />er truck :r Tanker, 5,000 Gal. <br />Total work team cost/hour : $623.95 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 7,200 CCY factor : 1.185 volume : 8.532 LCY <br />.* <br />Source of quantity take-off :Map 11 <br />Source of estimated swell factor : CAT Handbook <br />RN-05 <br />Exhibit 28-17 <br />(Revised 2/16/09)