Laserfiche WebLink
Oakridge Energy, Inc. received one notice of violation by CDRMS in calendar year 2007. <br />No other enforcement actions were issued to the Carbon Junction Mine in the three years <br />prior to the issuance of this notice by any federal, state, or other regulatory authority. No <br />enforcement actions have been issued subsequent to these notices to date. This notice has <br />been abated and subsequently terminated by CDRMS. No further administrative or <br />judicial review has been requested by Oakridge Energy for this notice. The civil <br />penalties assessed by CDRMS has been paid. <br />NOV Issuance Date Description Abatement Date Abatement <br />Number (as modified) of violation Measures <br />CV- 2007 -005 November 29, 2007 Failure to maintain ditch December Ditch <br />31,2007 1 maintained <br />2.03.6 Right of Entry and Operation Information <br />OEI's right of entry is predicated upon a coal mining lease from the Elizabeth Anne <br />Ewing Trust et al, transferring a 25 percent undivided interest in the coal rights to OEI. <br />Oakridge purchased all surface and a 75 percent undivided interest to the coal on the <br />permit property. <br />A 25 percent undivided interest in the mineral estate has been severed and is <br />appropriately conveyed to OEI. <br />Copies of the right of entry information are located in Exhibit B of Appendix 2.03. <br />p g rY PP <br />2.03.7 Relationship to Areas Designated Unsuitable for Mining <br />The area of the proposed activity is not partially or wholly within an area designated <br />unsuitable for surface coal mining operations under Rule 7 or 30 CFR 764; neither are the <br />lands under consideration for designation in an administrative proceeding under Rule 7 or <br />30 CFR 764 and 765. <br />2.03.8 Permit Term Information <br />Surface coal mining operations began in the first quarter of 1983 and subsequently ceased <br />operating temporarily pending more economical coal markets. No further coal mining <br />will occur at the Carbon Junction Mine under this permit. Final reclamation of the mine <br />site commenced in April 2006 and was completed in August 2006 (with the exception of <br />the sediment control system and topsoil piles that were not required for reclamation). <br />Abridged Permit Document 3-8 Feb 2008 <br />