Laserfiche WebLink
Agency or organization name Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal RN -03 <br />Task description : Regrade pond #2 fill <br />HOURLY : E : : : : :::::........................................................................................................................................................ ............................... <br />Q UIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) <br />Horsepower: <br />405 <br />Blade type Semi - Universal <br />volume: 2,065 LCY <br />Attachment no. 1 : ROPS Cab <br />Shift basis : <br />1 perday <br />Attachment no. 2 : -shank ripper <br />Source of estimated volume <br />: 0.64 acre X 2 <br />Data source : <br />(CRG) <br />Utilization <br />% <br />Cost Breakdown : Ownership cost/hour : $71.49 <br />NA <br />Operating cost/hour : $103.27 <br />100 <br />.:.:.......::................................ <br />HOURLY PRODUCTION :: <br />U O <br />Ripper op. cost/hour : $0.81 <br />10 <br />Operator cost/hour : $32.78 <br />NA <br />Total unit cost/hour : $208.34 <br />Total fleet cost/hour : <br />$208.34 <br />MATERIAL QUANTITIES <br />Initial <br />Swell <br />Loose <br />volume: 2,065 LCY <br />factor : <br />NA volume: <br />2,065 <br />LCY <br />Source of estimated volume <br />: 0.64 acre X 2 <br />ft. thick <br />Source of estimated swell factor : <br />.:.:.......::................................ <br />HOURLY PRODUCTION :: <br />U O <br />............................... <br />... <br />Job Condition Correction Factors <br />Source <br />Operator skill : <br />0.75 <br />(avg.) <br />Average push distance : 120 <br />feet <br />Material consistency: <br />0.70 <br />(Cat HB) <br />Unadjusted hourly production : 1,093.1 <br />LCY /hr <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility : <br />1.00 <br />(avg.) <br />Material consistency description : <br />Job efficiency : <br />0.83 <br />(lshift/day) <br />Rock, avg. ripped or blasted <br />Spoil pile: <br />0.80 <br />(fnd -ro <br />Push gradient : <br />0.99 <br />(Cat HB) <br />Average push gradient : 1.00 <br />% (pos) <br />Altitude : <br />1.00 <br />(Cat HB) <br />Average site altitude : 7,000 <br />feet <br />Material weight: <br />0.70 <br />(Cat HB) <br />Blade type : <br />1.00 <br />(S /SU /U) <br />Material weight: 3,300 <br />Ibs /LCY <br />Net correction : <br />0.24 <br />Weight description : <br />Decomposed rock - 75% Rock, 25% Earth <br />Adjusted unit production : <br />262.64 <br />LCY /hr <br />Adjusted fleet production : <br />262.64 <br />LCY /hr <br />JOBTIME AND COST :::::...................................................................................................................................................................... <br />............................... <br />Fleet size : 1 <br />Dozer(s) <br />Total job time: <br />7.86 <br />Hours <br />Unit cost : $0.793 <br />/LCY <br />Total job cost: <br />$1,638 <br />