Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 003 <br />Date : 0512012008 <br />User: TA <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal RN -03 <br />Task description: Move boulders & cobbles on N. Pit bench to inside edge of bench <br />HOURLY EQUIPMENT COST <br />State : Colorado <br />County La Plata <br />Site Carbon Junction Mine <br />Basic machine Cat D9R - 9SU (2005) <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:3-shank ripper <br />Shift basis : 1 per day <br />Source of estimated volume TR -12 cost estimate <br />Source of estimated swell factor CDRMS estimate <br />HOURLY PRODUCTION <br />Average push distance : 120 feet <br />Unadjusted hourly production : 1,093.1 LCY /hr <br />Material consistency description <br />Rock, well ripped or blasted <br />Average push gradient <br />Average site altitude <br />1.00 % (pos) <br />7,000 feet <br />Material weight: 3,300 Ibs /LCY <br />Weight description : <br />Decomposed rock - 75% Rock, 25% Earth <br />edition Correction Factors <br />Operator skill : <br />Material consistency: <br />Dozing method : <br />Visibility: <br />Job efficiency : <br />Spoil pile: <br />Push gradient : <br />Altitude : <br />Material weight: <br />Blade type : <br />Net correction : <br />0.75 <br />0.80 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.99 <br />1.00 <br />0.70 <br />1.00 <br />0.27 <br />Data source : (CRG) <br />(Cat HB) <br />(gen.) <br />Utilization % <br />Cost Breakdown: Ownership cost/hour: <br />$71.49 <br />NA <br />Operating cost/hour: <br />$103.27 <br />100 <br />Ripper op. cost/hour : <br />$0.81 <br />10 <br />Operator cost/hour: <br />$32.78 <br />NA <br />Total unit cost/hour : <br />$208.34 <br />Total fleet cost/hour: $208.34 <br />................................................................................................................................................................ <br />MATERIALUANTITIES ....................................................................................................................................................................... <br />Q <br />............................... <br />............................... <br />Initial Swell <br />Loose <br />volume : 6,423 CCY factor : <br />1.215 <br />volume: 7,804 LCY <br />Source of estimated volume TR -12 cost estimate <br />Source of estimated swell factor CDRMS estimate <br />HOURLY PRODUCTION <br />Average push distance : 120 feet <br />Unadjusted hourly production : 1,093.1 LCY /hr <br />Material consistency description <br />Rock, well ripped or blasted <br />Average push gradient <br />Average site altitude <br />1.00 % (pos) <br />7,000 feet <br />Material weight: 3,300 Ibs /LCY <br />Weight description : <br />Decomposed rock - 75% Rock, 25% Earth <br />edition Correction Factors <br />Operator skill : <br />Material consistency: <br />Dozing method : <br />Visibility: <br />Job efficiency : <br />Spoil pile: <br />Push gradient : <br />Altitude : <br />Material weight: <br />Blade type : <br />Net correction : <br />0.75 <br />0.80 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.99 <br />1.00 <br />0.70 <br />1.00 <br />0.27 <br />Source <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1shift/day) <br />(fnd -rf) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(S /SU /U) <br />Adjusted unit production <br />Adjusted fleet production <br />Permit/job# : C -92 -080 <br />Abbreviation : none <br />Filename : C080 -003 <br />Horsepower: 405 <br />300.17 <br />300.17 <br />LCY /hr <br />LCY /hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time: 26.00 Hours <br />Unit cost : $0.694 /LCY Total job cost : $ 5,417 <br />