Laserfiche WebLink
Date : 0542112008 <br />User: TAK <br />Permit or other job action RN -03 <br />Task description : Haul to gravel pit topsoil remaining in stockpiles #4 and #7 <br />. <br />HOURLY EQUIPMENT COST <br />Model: Cat 657E w /push -pull Shift basis : 1 per day <br />Cost Breakdown : <br />Struck volume : <br />Job utilization % <br />Horsepower : 1045 <br />Ownership cost/hour : <br />$132.14 <br />NA <br />Weight (UST) : 80.07 <br />Operating cost/hour : <br />$205.26 <br />100 <br />Cost data source : (CRG) <br />Operator cost/hour : <br />$24.95 <br />NA <br />minutes ** <br />Total unit cost/hour : <br />$ <br />Total fleet cost/hour : <br />$724.71 <br />........................................................................................................................................................... <br />::: ................................................................................................................................................................ <br />MATERIAL Q UANTITIES <br />Loading time : <br />1.10 <br />............................... <br />............................... <br />Initial <br />Swell <br />Loose <br />minutes <br />volume: 92,387 BCY <br />factor <br />: 1.4 29 volume: <br />131,981 LCY <br />Source of quantity take -off : Page 5-30 of permit application <br />Source of estimated swell factor DRMS estimate <br />HOURLY PRODUCTION ................................................................................................................................................................. ............................... <br />............................................................................................................................................................ ............................... <br />Hauling Capacity : <br />Scra Payload (weight) B asis : Scraper Bowl (volume) Basis: <br />Material weight: 2,900 pounds /LCY <br />Struck volume : <br />32.00 <br />LCY <br />Material description : <br />Heaped volume: <br />44.00 <br />LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />Average volume: <br />38.00 <br />LCY <br />Rated payload : 104,000 pounds <br />1,677 <br />0.75 <br />minutes ** <br />Payload capacity : 35.86 LCY <br />Adjusted capacity : <br />35.86 <br />LCY * ** <br />Cycle Time (load + haul + spread + return) : <br />Loading time : <br />1.10 <br />minutes <br />Job efficiency factor: <br />Maneuver and spreading time : <br />0.60 <br />minutes <br />Travel time: <br />loading time per pair on push -pull models <br />Adjusted fleet production : <br />Route <br />Distance (feet) <br />Grade ( %) <br />Roll. res.( %) <br />Total res.( %) <br />Velocity (fpm) <br />Travel time (min.) <br />2.79 <br />Haul: <br />1,000 <br />2.0 <br />5.0 <br />7.0 <br />1,677 <br />0.75 <br />minutes ** <br />Return : <br />1,000 <br />-2.0 <br />5.0 <br />3.0 <br />2,958 <br />0.34 <br />minutes ** <br />"travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resistance <br />shown, not average <br />Total cycle time <br />2.79 <br />minutes <br />Job Condition Correction Factors <br />: <br />Site altitude (feet) <br />: 7,000 <br />Adjusted Hourly Production <br />Altitude adjustment factor <br />: 1.00 (Cat HB) <br />Unadjusted unit production : <br />1,541.34 <br />LCY /Hour * ** <br />Job efficiency factor: <br />0.83 (1 shift/day) <br />Adjusted unit production : <br />1,279.31 <br />LCY /Hour <br />Adjusted fleet production : <br />1,279.31 <br />LCY /Hour <br />Net job correction factor <br />: 0.83 <br />' 2 times volume on push -pull models <br />............................................................................................................................................................... <br />JOB TIME AND COST :::::................................................................................................................................................................ <br />............................... <br />............................... <br />Fleet size <br />: 2 Scraper(s) <br />Total job time : <br />103.17 <br />Hours <br />Unit cost <br />: $0.56 /LCY <br />Total job cost : <br />$74,765 <br />County : Plata <br />Site: Carbon Junction Mine <br />Abbreviation : none <br />Filename: C080 -038 <br />