Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCRAPER - ONLY WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: CDRMS <br />Task #: 37a State : C olorado <br />Date : 05/21/2008 County: La Plata <br />User: TAK Site: Carbon Junction Mine <br />Permit or other job action : RN -03 <br />Task description Backfill Pond 1 <br />XXXXXXXXX <br />HOURLY EQUIPMENT COST <br />Model : Cat 657E w /push -pull Shift basis : 1 per day <br />Cost Breakdown : <br />Distance (feet) <br />Job utilization % <br />Horsepower <br />1045 <br />Ownership cost/hour <br />: $132.14 <br />NA <br />Weight (UST) <br />: 80.07 <br />Operating cost/hour <br />: $205.26 <br />100 <br />Cost data source <br />: (CRG) <br />Operator cost/hour <br />: $24.95 <br />NA <br />15.0 <br />5.0 <br />Total unit cost/hour <br />: $ 362.35 <br />Total fleet cost/hour : <br />$724.71 <br />0.83 (1 shift/day) <br />Adjusted unit production : <br />MATERIAL QUANTITIES <br />.........::.:::::::::::::::::::::::::::::::::.......:............................................ <br />............................... <br />.......... <br />Initial <br />Swell <br />Loose <br />: 0.83 <br />— 2 times volume on push -pull models <br />volume: 39,930 BCy <br />factor <br />: 1.330 volume: <br />53,107 <br />LCY <br />Source of quantity take -off <br />: Cost estimate <br />in TR -12 <br />2 Scraper(s) <br />Total job time : <br />Source of estimated swell factor DRMS estimate <br />Hours <br />Unit cost : <br />$ 0.422 /LCY <br />Total job cost : <br />HOURLY PRODUCTION <br />....... ::............. ......... <br />.......................................................................... <br />............................... <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,900 <br />pounds /LCY <br />Struck volume : <br />32.00 <br />LCY <br />Material description : <br />Heaped volume: <br />44.00 <br />LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />Average volume: <br />38.00 <br />LCY <br />Rated payload : 104,000 <br />pounds <br />Payload capacity: 35.86 <br />LCY <br />Adjusted capacity : <br />35.86 <br />LCY * ** <br />Cycle Time (load + haul + spread + return) : <br />Loading time: <br />1.10 <br />minutes' <br />Maneuver and spreading time : <br />0.60 <br />minutes <br />Travel time: <br />loading time per pair on push -pull models <br />Route <br />Distance (feet) <br />Grade ( %) <br />Roll. res.( %) <br />Total res.( %) <br />I Velocity (fpm) <br />I Travel time (min.) <br />minutes <br />Haul : <br />200 <br />-15.0 <br />5.0 <br />-10.0 <br />1 1,651 <br />1 0.18 <br />I minutes ** <br />Return : <br />200 <br />15.0 <br />5.0 <br />20.0 <br />1 1,002 <br />1 0.20 <br />I minutes ** <br />travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resistance shown, not average <br />Total cycle time <br />2.08 <br />minutes <br />Job Condition Correction Factors <br />: <br />Site altitude (feet) <br />: 7,000 <br />Adjusted Hourly Production ; <br />Altitude adjustment factor: <br />1.00 (Cat HB) <br />Unadjusted unit production : <br />2,068.56 <br />LCY /Hour * ** <br />Job efficiency factor: <br />0.83 (1 shift/day) <br />Adjusted unit production : <br />1,716.91 <br />LCY /Hour <br />Adjusted fleet production : <br />1,716.91 <br />LCY /Hour <br />Net job correction factor <br />: 0.83 <br />— 2 times volume on push -pull models <br />:.::::::::::::::.....::::::::::::::::::::::::::::::::::::............:::::::::X;.................................::.:::.......................................................................... <br />JOB TIME AND COST <br />............................... <br />Fleet size : <br />2 Scraper(s) <br />Total job time : <br />30.93 <br />Hours <br />Unit cost : <br />$ 0.422 /LCY <br />Total job cost : <br />$22,416 <br />Permit/job #: C -92 -080 <br />Abbreviation : none <br />Filename :C080 -37a <br />