My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-11_PERMIT FILE - C1992080
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992080
>
2008-08-11_PERMIT FILE - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:22 PM
Creation date
12/29/2009 8:43:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Permit File
Doc Date
8/11/2008
Doc Name
Cost Estimate
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency ov organization name Colorado Division OfReclamation, Mining And Safety <br />Permit or other job action Permit Renewal RN-03 <br />Task description Spread and grade topsoil for fill reveg.)mn North Pit <br />HOURLY EQUIPMENT COST <br />Basic machine: CetDQR DSU Horsepower: _ 405 <br />Blade type: Semi-Universa <br />Attachment no.1 :ROP3Cab Shiftbaois: 1 perday <br />Attachment no. 2 :3-shank ripper <br />Data source <br />Utilization % <br />Cost Breakdown <br />Ownomhip000t/hour <br />$ 71.49 <br />NA <br />OperatingnouVhour: <br />$ 103.27 <br />100 <br />Ripper op. cost/hour : <br />$0. <br />10 <br />Operator cost/hour: <br />$3 2.78 <br />NA <br />Total unit onut/hnur: <br />$20034 Total fleet oouVhour: $20034 <br />MATERIAL QUANTITIES <br />|niUo| <br />Swell <br />Loose <br />volume: 54,286 LCy factor <br />&0 volume: <br />54,286 <br />LCY <br />Source of estimated volume: Swelled volume from Task DDO <br />Source of estimated swell factor:NA <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />Operator skill : <br />0.75 <br />(avg.) <br />Average push distance <br />140 feet <br />Material consistency: <br />1.20 <br />(Cat HB) <br />Unadjusted hourly production <br />968.5 LCY/hr <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Material consistency description <br />Job efficiency: <br />0.83 <br />(Ishiftlday) <br />Loose stockpile <br />Spoil pile: <br />0.80 <br />(ind-ro <br />Push gradient <br />0.30 <br />(Cat HB) <br />Average push gradient: <br />30.00 % (pos) <br />Altitude <br />1.00 <br />(Cat HB) <br />Average site altitude <br />7,000 feet <br />Material weight: <br />0.90 <br />(Cat HB) <br />Material weight: <br />Z 550 lbs/LCY <br />Net correction <br />0.16 <br />Weight description <br />Earth - Dry packed <br />Adjusted unit production <br />155.55 <br />LCY/hr <br />Adjusted fleet production <br />155.55 <br />LCY/hr <br />Fleet size <br />1 Dozer(s) <br />Total job time: <br />348.99 <br />Hours <br />Unit cost <br />$1.339 /LCY <br />Total job cost <br />$72,709 <br />
The URL can be used to link to this page
Your browser does not support the video tag.