My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-23_HYDROLOGY - M2006003
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2006003
>
2009-12-23_HYDROLOGY - M2006003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:04 PM
Creation date
12/28/2009 1:37:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006003
IBM Index Class Name
HYDROLOGY
Doc Date
12/23/2009
Doc Name
Substitute Water Supply Plan
From
OSE
To
Civil Resources, LLC
Permit Index Doc Type
Hydrology Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />Mr. Andy Rodriguez, P.E. <br />December 22, 2009 <br />Page 5 <br />13. This substitute water supply plan may be revoked or modified at any time should it be <br />determined that injury to other water rights has or will occur. as a result of this plan. <br />Should this-:substitute water supply plan expire without renewal or be revoked prior to <br />adjudication of a permanent plan for augmentation, all excavation of product from below <br />the water table, and all other use of water at the pit, must cease immediately. <br />14. Dewatering at this site will produce delayed depletions to the stream system. As long as <br />the pit is continuously dewatered, the water returned to the stream system should be <br />adequate to offset the depletions attributable to the dewatering operation. If dewatering <br />at the site ceases, the delayed depletions must be addressed. At least three years prior <br />to completion of dewatering, a plan must be submitted that specifies how the post <br />pumping dewatering depletions (including refilling of the pit) will be replaced, in time, <br />place and amount. <br />15. To assure that depletions from groundwater evaporation do not occur in the unforeseen <br />event, or events, that would lead to the abandonment of the pit, a bond for $974,000.00 <br />through DRMS for lining or backfilling of the pit has been obtained. Therefore, in case of <br />abandonment the bond can finance the completion of the lining of the pit or the <br />backfilling, thus preventing depletions to the stream system. <br />16. In accordance with amendments to Section §25 -8- 202 -(7), C.R.S. and "Senate Bill 89 -181 <br />Rules and Regulations" adopted on February 4, 1992, the State Engineer shall determine <br />if this substitute water supply plan is of a quality to meet requirements of use to which the <br />senior appropriation receiving the substitute supply has normally been put. As such, water <br />quality data or analyses may be requested at any time to determine if the requirement of <br />use of the senior appropriator is met. <br />17. The decision of the state engineer shall have no precedential or evidentiary force, shall <br />not create any presumptions, shift the burden of proof, or serve as a defense in any <br />water court case or any other legal action that may be initiated concerning the substitute <br />water supply plan. This decision shall not bind the State Engineer to act in a similar <br />manner in any other applications involving other plans or in any proposed renewal of this <br />plan, and shall not imply concurrence with any findings of fact or conclusions of law <br />contained herein, or with the engineering methodologies used by the Applicant. <br />Should you have any questions, please contact loana Comaniciu of this office or Mr. Dave <br />Nettles of our Division office in Greeley at (970) 352 -0742. <br />Sincerely, <br />Ke in G. Rein, P.E. <br />sistant State Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.