Laserfiche WebLink
PREDICTED DRAWDOWN -STROH PIT 1005FT FROM PIT <br />Input Data for prediction of drawdown <br />K Equation used in prediction <br />Hydraulic conductivity, K, ft/day 700 Q �W �� �� I z S <br />Aquifer Thickness, b, ft 20' 0.01 0.1 1 10 100 1000 S = V 4Tt <br />Storage Coefficient, S 0.000512 4)r <br />Pumping Rate, GPM 650 S <br />Distance from well, ft 1005 s is drawdown, W(u) is the well <br />0.000001 0.00001 0.0001 0.001 0.01 0.1 1 <br />3.5 PREDICTED DRAWDOWN <br />3 <br />F— <br />w 2.5 <br />LL <br />Z <br />z 2 <br />0 1.5 <br />1 <br />O <br />0.5 <br />0 t <br />0:00:01 0:00:09 0:01:26 0:14:24 2:24:00 24:00:00 <br />TIME IN HOUR:MINUTE:SECOND <br />3.5 <br />3 <br />w 2.5 <br />w <br />LL <br />z 2 <br />z <br />3 <br />p 1.5 <br />a 3 <br />p 1 <br />0.5 <br />0 <br />0:00:00 3:00:00 6:00:00 9:00:00 12:00:00 15:00:00 18:00:00 21:00:00 24:00:00 <br />TIME IN HOUR:MINUTE:SECOND <br />