My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-17_INSPECTION - M1981185
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1981185
>
2009-12-17_INSPECTION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:47 PM
Creation date
12/24/2009 8:11:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
INSPECTION
Doc Date
12/17/2009
Doc Name
Insp Rpt
From
DRMS
To
Wildcat Mining Corporation
Inspection Date
11/24/2009
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT <br />Machine Total <br />Description Cost hour /unit <br />-Light Duty Pickup, 4x4, 314 T. $50.15 <br />- Flatbed Truck, 4x2, 30K GVW $46.28 <br />-Light Duty Pickup, 44, 1 T. Crew $7 8.69 <br />-Light Duty Pickup, 4x4, 314 T _ $49.60 <br />EQUIPMENT HAUL DISTANCE and TIME <br />sheet of 2 <br />Fleet Size <br />;No. units) <br />Haul Trip <br />Cost/hr /fleet <br />Return Trip <br />Cost/hr/fleet <br />Dwauge <br />Trans portation C Time : <br />Nan- <br />1 <br />$50.15 <br />$50.15 <br />Roadable <br />_ <br />1 <br />$46.28 <br />$46.28 <br />Equipment <br />Equipment <br />$157.38 <br />2 $157.38 <br />1 <br />Subtotals: $303.41 $303.41 <br />JOB TIME AND COST Total job time'. 4.00 hours <br />Total job cost $1,538 <br />Nearest major city or town within project area region : <br />Dwauge <br />Trans portation C Time : <br />Nan- <br />Total one -way travel distance: <br />20.0 miles <br />Roadable <br />Readable <br />Average travel speed : <br />40.0 _ mph <br />Equipment <br />Equipment <br />Haul time (hours) = <br />0 <br />0.50 <br />Total non - roadable mob /demob cost `: <br />$1,234.95 <br />Return time (hours) = <br />0.50 <br />0.50 <br />• mo round turns with haul n <br />Loading time (hours) = <br />0.50 <br />NA <br />Total readable mob /demob cast ": <br />$303.41 <br />Unloading time (hours) = <br />0.50 <br />NA <br />° one round trip, no haul rig <br />Subtotals= <br />2.00 <br />1.00 <br />JOB TIME AND COST Total job time'. 4.00 hours <br />Total job cost $1,538 <br />
The URL can be used to link to this page
Your browser does not support the video tag.