Laserfiche WebLink
Agency or organization name : DRMS _ <br />Permit or otherjob action : Rou t ine bond update <br />Task description : Highwall reduction at Level 1 (active) portal <br />HOURLY EQUIPMENT COST <br />Machine description : Cat 320C Horsepower: _ 138 <br />Weight (MT) : 19.70 <br />Cost Breakdown <br />: <br />CIRCES Cost Estimating <br />Software <br />Site altitude: 9,200 feet <br />Ownership cost/hour: <br />$2 6.22 <br />HYDRAULIC EXCAVATOR WORK <br />(Cat HB) <br />PROJECT <br />IDENTIFICATION <br />100 <br />_ <br />Operator cost(hour: <br />Task #: <br />0 <br />State:Colora <br />Permit/job #:M- <br />1981 -185 <br />Date: <br />09115/2009 <br />County: Plata <br />Abbreviation <br />none <br />User: <br />WHE <br />Site: Day Mine <br />Filename:M185 <br />-007 <br />Agency or organization name : DRMS _ <br />Permit or otherjob action : Rou t ine bond update <br />Task description : Highwall reduction at Level 1 (active) portal <br />HOURLY EQUIPMENT COST <br />Machine description : Cat 320C Horsepower: _ 138 <br />Weight (MT) : 19.70 <br />Cost Breakdown <br />: <br />Utilization <br />Site altitude: 9,200 feet <br />Ownership cost/hour: <br />$2 6.22 <br />NA <br />(Cat HB) <br />Operating cost/hour: <br />$4 2.86 <br />100 <br />_ <br />Operator cost(hour: <br />$38.72 <br />NA <br />0.72 <br />Total unit cost/hour: <br />$107,80 <br />Unadjusted hourly unit production : <br />MATERIAL QUANTITIES <br />Initial <br />228.61 LCY /hour <br />Swell <br />volume: <br />1,117 LCY <br />factor: <br />N A <br />Shift basis : 1 per day <br />Data source:: (CRG) <br />Total fleet cost /hour: $107.80 <br />Loose <br />volume: 1,117 LCY <br />Source of estimated volume : See allaChed draw ing, "Highwall Reduction, Level 1" _ <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket. swino loaded. dump bucket, swing em <br />Basic job condition description: AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.26 minutes <br />Bucket Capacity <br />Rated bucket capacity: 2.22 LCY (heaped) Bucket size class: large <br />Bucket fill factor: 0.68 Rock - Well blasted (60% - 75%) <br />Adjusted bucket capacity : 1.50 LCY <br />Job Condition Correction Factors <br />Source <br />Site altitude: 9,200 feet <br />Altitude adjustment <br />0 <br />(Cat HB) <br />Job efficiency adjustment: <br />0.83 <br />_ <br />(1 shilNday) <br />Net job correction: <br />0.72 <br />multiplier <br />Unadjusted hourly unit production : <br />316.58 LCY /hour <br />Adjusted hourly unit production : <br />228.61 LCY /hour <br />Adjusted hourly fleet production <br />Z 28.61 LCY /hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) <br />Total job time : <br />4.89 <br />hours <br />Unit cost: $0. 472 per LCY <br />Total job cost: <br />$527 <br />