Laserfiche WebLink
1 <br />Previous Bond Releases <br />The Division has previously approved five bond release applications submitted by the operator as <br />summarized in Table 3, below. <br />Table 3 - Previous bond releases at the North Thompson Creek Mines. <br />Bond Decision Bond <br />Release issuance Phase Area amount <br />File No. date released <br /> Removal of structures and regrading in <br /> mine area (including No. 3 Mine Portal), <br /> former refuse disposal area, and loadout, <br />SL-1 3/28/1988 1 but excluding all ponds and flumes, $117,920 <br /> piezometers D-1A and D-2A, undermined <br /> areas, and prime farmland in loadout <br /> area. <br />SL-2 11/23/1993 I'll, III Prime farmland in Ioadout area. $45,000 <br />SL-3 11/24/1993 III Diamond A parcel in Ioadout area. $78,267 <br />SL-4 11/13/2001 1,11 Phases I and II: No. 1 Mine Portal and $158,430 <br />surface facilities area, Refuse Area <br />Pond, Developed Water Resources <br />Area. <br />Phase II only: Mine No. 3 Portal and <br />surface facilities area, but excluding four <br />flumes, piezometers D-1A and D-2A, and <br />undermined areas),Stony Ridge fan site <br />and road/bridge, Ioadout area. <br />SL-5 3/24/2003 III Stony Ridge fan site and road/bridge, $53,497 <br />Ioadout area, and the mine site, including <br />the No.1 and No. 3 Mine portals and their <br />surface facilities areas, but excluding: <br />Developed Water Resources Area, four <br />flumes, piezometers D-1A and D-2A, and <br />undermined affected areas of No. 1 and <br />No. 3 Mines. <br />7