Laserfiche WebLink
MAN__ IFOLD LENGTH [ML] * = Field Length [L] - (1) (SM) <br />(780) ft. (ML] <br />NUMBER SETS ML +1 +1 ?.3 sets per field <br />Sm <br />*Use multiples of 60 ft. Note this length may be 'Shorter if 6.0 <br />ft. swing lines are used. <br />MAINLINE CAPACITY <br />(Manifold) <br /> <br />MAINLINE CAP.=_(#head rec'd_ [171 ) x (nozzle flow (gpm) [161 ) x <br />,s?de? f141 ) <br /> <br />= a?? 5J gpm = gpm = CO, ?l> c f s. <br />449 <br />TOTAL SIDEROLL PRESSURE RE UIRED: <br />TOTAL PRESSURE REQUIRED QSMUPS + swing line loss + ri.9er, hydrant and <br />valve loss. <br />TOTAL = (YS? )Psi req. at beginning of sideroll' riser <br />TOTAL SYSTEM PRESSURE <br />RE UIRE?MENT^ <br />= Required sideroll pressure +,Mainline pressure. <br />losses. <br />Mainline pressure losses are found by using the pipeline com- <br />puter program. Mainline losses should be checked at the <br />beginning set and last set and any restrictive sets inbetween. <br />TOTAL <br />7?? psi at beginning of system.