Laserfiche WebLink
'_,1£}RKSHEET <br />MARCH 1993 <br />SIDEROLL SPRINKLER DESIGN WORKSHEET <br />Based on (Old and New) Colorado Irrigation Guide and <br />National Engineering Handbook Sec. 15, Chap. 11 <br />Project Name:, <br />Designer:,_ Date: <br />Field #: Checked by: Date: <br />PRELIMINARY DATA: J <br />DESIGN CROP: ( Use crop with greatest water needs. <br />SOIL NAME J_ V -X <br />I <br />A),/cep, <br />TOWN: <br />SPRINKLER LATERAL <br />SLOPE (S]. "+" for downhill slope, <br />;1-11 for uphill slope <br />MINIMUM PRESSURE / v psi available for sideroll [P] <br />FIELD DIMENSIONS <br />LENGTH eT CJo ft. [L] <br />-- WIDTH <br />6L4 104 <br />SOILS INFORMATION: <br />(mainfold or mainline <br />direction) <br />ft. [W] (sideroll direction) <br />DESIGN GROUP / <br />(CIG Section 2B) <br />MAX SPRINKLER Q <br />APP. RATE v inch/hr. [1] <br />(CIG Section 2-C, CIG Table G-D-1, Table CO685.70) <br />ROOT DEPTH / ft. [23 <br />,-'(Attached table 11-2 or Table CO684,2) <br />MOISTURE EXTRACTION <br />DEPTH (Table 00684.2) ft. (max 5ft.) [3 <br />v