My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-15_REVISION - M1980146
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980146
>
2009-12-15_REVISION - M1980146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:15 PM
Creation date
12/22/2009 8:25:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980146
IBM Index Class Name
REVISION
Doc Date
12/15/2009
Doc Name
Request for Extension of Decision Date and Revised Maps
From
Wasteline Inc.
To
DRMS
Type & Sequence
AM4
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a WASTE"LINE !NC. <br />«° P.O. Box 3471 Rapid City, SD 57709 -3471 (605)348 -0244 <br />tio0� PO Box 88 Cortez, CO 81321 -0088 (970) 564 -1380 CELL (605) 390 -7255 <br />E - mail: WASTELINEWaol.com or SDLibegyAgol.com <br />27 November 2009 <br />Colorado Division of Reclamation, Mining, and Safety <br />ATTN: Mr. Bob Oswald <br />691 CR 233, Suite A -2 <br />Durango, CO 81301 <br />M <br />SUBJECT: 112 PERMIT AMENDMENT #4 APPLICATION, FILE NO. M -1980 -146 <br />RESPONSE TO COMMENT 43 AND REQUEST _EST FOR EXTENSION OF DECISION DATE <br />Dear sir: <br />This letter addresses only the two outstanding issues: <br />1. Authority to mine <br />2. Geotechnical stability <br />In addition, as discussed, we are requesting an extension of the decision date from 30 November <br />2009 to 31 January 2010, to allow time to review and further comment and respond on any <br />remaining issues, and because we have been unable to obtain the necessary documents from the <br />BLM. This is done with the understanding that if the issues are resolved more quickly, the <br />decision can be made more quickly as well. Thank you for your understanding in this. <br />As discussed in conversations, we have again requested that BLM correct the mineral <br />lease /purchase agreement to show the correct sections of land involved. As soon as that is <br />available, we will provide a copy to the DRMS. <br />As requested, and based on your guidance, we have further elaborated on the actual proposed <br />post - reclamation terrain and structures, and on the measures proposed to ensure the stability of <br />the area of the new access road. Additional drawings are provided, and replace drawings <br />previously submitted for the Geo- Technical Stability Exhibit. These are intended to be <br />clarification and explanation of what has been proposed previously, and are not intended to be a <br />technical revision to the application. <br />There are a total of four sheets: GTSC -la shows pre- mining contours, the remainder show <br />proposed post- reclamation contours, with various features called out in each map, such as slopes <br />and roadways. All are to the scale of 1" =200'. The cross - section on GTSC -2b is taken from <br />Sheet F -6/1 of the amendment application, to ensure that it matches the original submittal. I <br />believe that all the items identified in Rules 6.2, 6.5, and your message are provided. <br />Please let us know of any further issues we need to resolve. <br />Weamm <br />Respectfully submitted, <br />r DEC 21 2 009 <br />Division of Redama tig <br />f Y n, <br />Wining and S a fe ty <br />Nathan A. Barton, CE, PE, DEE, Environmental Engineer � <br />
The URL can be used to link to this page
Your browser does not support the video tag.