My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 12/22/2009, 7:54:04 AM-JWD
DRMS
>
Public
>
PERMIT FILE - 12/22/2009, 7:54:04 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:22 PM
Creation date
12/22/2009 8:01:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009038
IBM Index Class Name
PERMIT FILE
Doc Date
12/21/2009
Doc Name
New NOI, Prospecting,Form 2
From
Mount Sneffels Mining Company, LLC
To
DRMS
Email Name
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (Form 2- Public) <br />Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Very litt topsoil is present any of the 7 drill si tes. <br />Most of the sites are located in talus fields composed of varying <br />sizes o roc S ome Ines o exi st. All fines and topsoil will <br />areas. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />T)ri 1 1 ho G at Gi 1 thr» 4 wj 11 not he�n1 i�r7r-rad as the4l ZSe Wi thin <br />the permit boundary of the Ruby Trust Mine. All other drill holes <br />ill be plugged from first solid rock encounter to total depth. <br />w <br />- After surface 3, xeinoyed anconsulidat�xterta <br />will fill from first Golid rnnk }n UP surface <br />les <br />Ce <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />R oads and d ri l 1 gi j-PG w i l l he re r!nnt,n»rpr tn the original <br />topography. Any previously stockpiled fines and /or topsoil will <br />then be placed to enhance revegetation. Larger rock will en be <br />scattered over the dista areas. Reseeding will the <br />undert akpII <br />6. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition <br />Same as item 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.