My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 12/22/2009, 7:44:55 AM-JWD
DRMS
>
Public
>
PERMIT FILE - 12/22/2009, 7:44:55 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:22 PM
Creation date
12/22/2009 8:01:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009036
IBM Index Class Name
PERMIT FILE
Doc Date
12/14/2009
Doc Name
New NOI, Prospecting, Form 2
From
Lynx-Royal JV LLC
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (Form 2- Public) <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Topsoil. if rep sent, is estimated to be less than 1 foot deep Any topsoil disturbed will be <br />saved, stockpiled to one side and redistributed over said disturbed area during <br />reclamation. See Attachment A for more information <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Any cuttings are to be returned to the hole to the extent possible Remaining cuttings will <br />be buried in the containment pits. The holes will be plugged with spray foam or concrete <br />plug from five feet to within two feet of the surface and filled with available soil and or soil <br />mixed with cuttings. <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />The topsoil from the containment pits will be bermed on the lower side When reclaiming <br />the site the bermed soil will be pushed back across the pits, dragged or raked and seeded <br />mixture. <br />6. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />No road disturbance is expected <br />
The URL can be used to link to this page
Your browser does not support the video tag.