Laserfiche WebLink
CIRCES Cost Estimating Softw <br />PROJECT IDENTIFICATION <br />Task #: 05a <br />Date : 1211512009 <br />User: GRM <br />Agency or organization name DRMS <br />Permit or other job action : Initial Reclamation Liability Estimate <br />Task description :Final Site gra <br />HOURLY EQUIPMENT COST <br />Basic machine CAT 14H <br />State : Colorado <br />County : Moffat <br />Site Peroulis Snake Ri Pit <br />Permit/job # : M2009079 <br />Abbreviation : none <br />Filename :M079 -05a <br />Horsepower: 215 <br />Attachment no. 1 : <br />Attachment no. 2 :Multi -sh ripper <br />Cost Breakdown Ownership cost/hour : <br />Grader operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour <br />Shift basis: 1 per day <br />Data source : (CRG) <br />Utilization <br />$45.57 NA <br />$46.26 100 <br />$0.33 10 <br />$24.50 NA <br />$116.65 Total fleet cost/hour : $ 116.65 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 35.00 acres <br />Source of estimated acreage : reclamation plan <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0 -2.5 mph) <br />Average grader speed : <br />1.25 <br />mph <br />Selected blade angle : <br />30 <br />degrees <br />Effective blade length : <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass : <br />10.10 <br />feet'" <br />Unadjusted hourly unit production : --- T.5303 <br />acres /hour <br />Job Condition Correction Factors <br />Average site altitude : 6,100 feet <br />* at 0 degrees, blade is perpendicular <br />to direction of travel. <br />** width of ripper beam on ripping applications <br />Source <br />Altitude adjustment factor : 1.00 ( Cat HB <br />Job efficiency adjustment factor: 0.85 _(1s /d, mo <br />Net job correction : 0.8500 multiplier <br />Adjusted hourly unit production : 1.3008 acres /hour <br />Adjusted hourly fleet production : — i.3008 acres /hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time: 26.91 hours <br />Unit cost : $89.68 per acre Total job cost : $ 3,139 <br />