My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-14_PERMIT FILE - M2009035
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009035
>
2009-12-14_PERMIT FILE - M2009035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:41 PM
Creation date
12/22/2009 8:01:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009035
IBM Index Class Name
PERMIT FILE
Doc Date
12/14/2009
Doc Name
Approval Letter
From
DRMS
To
M.A. Concrete Construction, Inc.
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />SCRAPER - ONLY WO <br />PROJECT IDENTIFICATION <br />Agency or organization name DRMS _ <br />Task #: 05a State : Co lo ra do <br />Date : 1211112009 County : Mesa <br />User : THM Site : 32.5 Road Gravel Pit <br />Permit or other job action : Final Reclamation Cost Estima <br />Task description :Gravel Line Ponds 6" Thick <br />_. <br />HOURLY EQUIPMENT COST <br />Model : Cat 633E Series 2 (2001) Shift basis : 1 per day <br />Cost Breakdown: <br />Job utilization % <br />Horsepower : 490 <br />Ownership cost/hour: <br />$80.67 <br />NA <br />Weight (UST) : 56.34 <br />Operating cost/hour: <br />$124.44 <br />100 <br />Cost data source : (CRG) <br />Operator cost/hour : <br />$38.72 <br />NA <br />Total unit cost/hour : <br />$ 243.82 <br />Total fleet cost/hour : <br />$243.82 <br />MATERIAL QUANTITIES <br />Scraper Bowl (volume) Basis: <br />Initial <br />Swell <br />Loose <br />LCY <br />volume : 20,000 LCY <br />factor :_ <br />NA volume: <br />20,000 LCY <br />Source of quantity take -off : Exhibit L <br />Source of estimated swell factor: NA <br />HOURLY PRODUCTION <br />Hauling Capacity: <br />Scraper Payload (weight) Basis : <br />Scraper Bowl (volume) Basis: <br />Material weight: 3,400 pounds /LCY <br />Struck volume : <br />23.20 <br />LCY <br />Material description : <br />Heaped volume: <br />34.00 <br />LCY <br />Gravel - Wet (1 14 "- 2 "diam.) <br />Average volume: <br />28.60 <br />LCY <br />Rated payload : 82,000 pounds <br />: <br />Payload capacity 24.12 LCY <br />Adjusted capacity : <br />24.12 <br />LCY * ** <br />Cycle Time (load + haul + spread + return) : <br />Loading time: <br />0.90 <br />minutes <br />Maneuver and spreading time : <br />0.70 <br />minutes <br />Travel time: <br />loading time per pair on push -pull models <br />Route <br />Distance (feet) <br />Grade ( %) <br />Roll. res.( %) <br />Total res.( %) <br />Velocity (fpm) <br />Travel time (min.) <br />H aul : <br />500 <br />0.0 <br />5.0 <br />5.0 <br />1,375 <br />0.51 <br />m inutes ** <br />Return : <br />500 <br />0.0 <br />5.0 <br />5.0 <br />2,288 <br />0.22 <br />minutes ** <br />*" travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resistance shown, not average <br />Total cycle time : <br />2.33 <br />minutes <br />Job Condition Correction Factors : <br />Site altitude (feet) : <br />Adiusted Hourly Production ; <br />Altitude adjustment factor : <br />Unadjusted unit production : <br />622.23 <br />LCY /Hour * ** <br />",62 <br />Job efficiency factor : <br />Adjusted unit production : <br />516.45 <br />LCY /Hour <br />Adjusted fleet production : <br />516.45 <br />LCY /Hour <br />Net job correction factor : <br />"" 2 times volume on push -pull models <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) <br />Total job time : <br />38.73 <br />Hours <br />Unit cost : $ 0.472 /LCY <br />Total job cost <br />: $9,442 <br />Permit/job # M -2009 -035 <br />Abbreviation : none <br />Filename : M035 -05a <br />
The URL can be used to link to this page
Your browser does not support the video tag.