My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-14_PERMIT FILE - M2009035
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009035
>
2009-12-14_PERMIT FILE - M2009035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:41 PM
Creation date
12/22/2009 8:01:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009035
IBM Index Class Name
PERMIT FILE
Doc Date
12/14/2009
Doc Name
Approval Letter
From
DRMS
To
M.A. Concrete Construction, Inc.
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PUMPING WORK <br />PROJECT IDENTIFICATION <br />Task no.: 01a State : Colorado Permit/job no.: M-2009-035 <br />Date <br />User <br />12/11/2009 <br />THM <br />Agency or organization name DRMS <br />Permit or other job action : Final Reclamation cost estimate <br />Task description :Dewater north pond <br />Abbreviation : none <br />Filename : M035 -01a <br />HOURLY EQUIPMENT COST <br />Description Quantity <br />Data <br />Source <br />Pump <br />Centrifugal pump - 200M, 10 in. <br />1 <br />(CRG) <br />Suction hose : <br />Suction pipe - 10 in. diam., 25 ft. <br />2 <br />(CRG) <br />Discharge hose <br />Discharge pipe - 10 in. D., 25 ft. <br />4 <br />(CRG) <br />Labor:NA <br />Horsepower: <br />0 <br />NA <br />Cost Breakdown: <br />Job Utilization <br />Ownership cost/hour: <br />$8.10 <br />NA <br />Job shift basis : <br />3 per day <br />Operating cost/hour : <br />$21.08 <br />100 % <br />Horsepower: <br />70 <br />Operator cost/hour : <br />$0.00 <br />NA <br />Weight (UST) : <br />1.95 <br />Total cost/hour : <br />$29.19 <br />Total fleet cost/hour : <br />$29.19 <br />PUMPING QUANTITIES <br />Initial pond <br />Conversion <br />Final pond <br />volume : 20. acre feet <br />factor: <br />325,8 volume: <br />6,634,318 <br />gallons <br />Total pond inflow surface <br />Unit inflow rate <br />in Total pond inflow <br />volume <br />area : 2,800 sq. ft. <br />gph /sq. ft.: <br />0.1758 per hour : <br />492:24 <br />gph <br />Source of volume estimate : 700 LF x 4' depth <br />PUMPING TIME <br />Maximum pump capacity: <br />70 <br />gph /pump <br />Adjusted pumping capacity: <br />201,000 <br />gph <br />Estimated suction head : <br />5 <br />feet <br />Initial unadjusted pumping time <br />33.01 <br />hours <br />Estimated discharge head : <br />15 <br />feet <br />Inflow during initial pumping : <br />16,247 <br />gallons <br />Total head : <br />20 <br />feet <br />Net unadjusted pumping time : <br />33.09 <br />hours <br />CPB pump capacity: <br />201,000 <br />gph /pump <br />Altitude adjustment factor: <br />1.0309 <br />(3% rule) <br />Site altitude : <br />4,620 <br />feet <br />Pump efficiency factor: <br />1.0909 <br />(55 min. /hr.) <br />Inflow as % of pond volume: <br />NA <br />% <br />Total adjusted pumping time : <br />37.21 <br />hours <br />JOB TIME AND COST <br />Total job time: <br />37.21 <br />hours <br />Unit cost : <br />$0.000163 <br />per gallon <br />Total job cost: <br />$1,086 <br />County : Mesa <br />Site :32.5 Road Gravel Pit <br />
The URL can be used to link to this page
Your browser does not support the video tag.