Laserfiche WebLink
- _. <br />nnnnwnr C Cf% nDneGtiT sheet 2 of 2 <br />Machine <br />Description <br />Total <br />Cost/houdunit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr /fleet <br />Return Trip <br />Cost/hr /fleet <br />-Wa ter Tanker, 2,500 Gal. <br />$45.35 <br />1 <br />$45.35 <br />$45.35 <br />- Flatb Truck, 4x2, 30K GVW <br />$47.34 <br />1 <br />$47.34 <br />$47.34 <br />Equipment <br />Equipment <br />Haul time (hours) = <br />0.14 <br />0.14 <br />Total non - roadable mob /demob cost * : <br />$4,399.72 <br />Return time (hours) = <br />0.14 <br />0.14 <br />* two round trips with haul rig <br />Loading time (hours) = <br />0.50 <br />NA <br />Total roadable mob /demob cost**: <br />$26.48 <br />Unloading time (hours) = <br />0.50 <br />NA <br />** one round trip, no haul rig <br />Subtotals = <br />1.29 <br />0.29 <br />JOB TIME AND COST <br />Total job time: <br />2.57 hours <br />Total job cost : <br />$4,426 <br />Subtotals : <br />$92.70 <br />$92.70 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : <br />Grand Junction <br />Transportation Cycle Time : <br />Non- <br />Total one -way travel distance : <br />5.0 miles <br />Roadable <br />Roadable <br />Average travel speed : <br />35.0 mph <br />Equipment <br />Equipment <br />Haul time (hours) = <br />0.14 <br />0.14 <br />Total non - roadable mob /demob cost * : <br />$4,399.72 <br />Return time (hours) = <br />0.14 <br />0.14 <br />* two round trips with haul rig <br />Loading time (hours) = <br />0.50 <br />NA <br />Total roadable mob /demob cost**: <br />$26.48 <br />Unloading time (hours) = <br />0.50 <br />NA <br />** one round trip, no haul rig <br />Subtotals = <br />1.29 <br />0.29 <br />JOB TIME AND COST <br />Total job time: <br />2.57 hours <br />Total job cost : <br />$4,426 <br />