Laserfiche WebLink
CIRCES Cost Estimating Softwar <br />ArRAPER - ONLY WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name DRMS <br />Task #: 09a State: Colorado <br />Date : 1211412009 <br />User: THM <br />Permit or other job action : Fianl Reclamation Cost Estimate <br />Task description Placement of 6 in ches of <br />HOURLY EQUIPMENT COST <br />Cost Breakdown—: <br />over 6.19 acres <br />Shift basis : 1 per day <br />Job utilization % Horsepower 490 <br />W ' ht (UST) • 5634 <br />Ownership cost/hour: <br />$80.67 <br />NA <br />elg - <br />Operating cost/hour : <br />$124.44 <br />100 Cost data source : <br />(CRG) <br />Operator cost/hour : <br />$38.72 <br />NA <br />Total unit cost/hour : <br />$243.82 <br />Total fleet cost/hour : <br />$243.82 <br />MATERIAL QUANTITIES <br />Initial <br />Swell <br />Loose <br />volume: 4,800 LCY <br />factor : <br />NA volume: <br />4,800 <br />LCY <br />Source of quantity take -off : Reclamation <br />Plan <br />Source of estimated swell factor <br />NA <br />HOURLY PRODUCTION <br />Hauling Capacity <br />Scraper Payload (weight) Basis : <br />Scraper Bowl (volume) Basis <br />Material weight: 1,600 <br />/LCY <br />Struck volume : <br />23.20 <br />LCY <br />-pounds <br />Heaped volume: <br />34.00 <br />LCY <br />Material description : <br />Average volume: <br />28.60 <br />LCY <br />Top So <br />Rated payload : 82,000 <br />pounds <br />Payload capacity : 51.25 <br />LCY <br />Adjusted capacity: <br />28.60 <br />LCY * ** <br />Cycle Time (load + haul + spread + return) : <br />Loading time: <br />0.90 <br />minutes <br />Maneuver and spreading time: <br />0.70 <br />minutes <br />Travel time: <br />loading time per pair on push -pull models <br />Route <br />Distance (feet) <br />Grade ( %) <br />Roll. res.( %) <br />Total res.( %) <br />Velocity (fpm) <br />Travel time (min.) <br />** <br />Haul : <br />800 <br />0.0 <br />5.0 <br />5.0 <br />1,375 <br />0.73 <br />minut <br />** <br />Return : <br />800 <br />0.0 <br />5.0 <br />5.0 <br />2,288 <br />0.35 <br />minutes <br />" travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resistance shown, <br />not average <br />cycle time <br />Total c y <br />2.67 <br />minutes <br />Job Condition Correction Factors : <br />Site altitude (feet) : 4,625 <br />Adiusted Hourly Production ; <br />Altitude adjustment factor : 1.00 <br />(Cat HB) <br />Unadjusted unit production : <br />641.52 <br />LCYIHour * ** <br />Job efficiency factor : 0.83 <br />(1 shift/day) <br />Adjusted unit production : <br />532.46 <br />LCY /Hour <br />Adjusted fleet production : <br />532.46 <br />LCY /Hour <br />Net job correction factor : 0.83 <br />"' 2 times volume on push -pull models <br />JOB TIME AND COST <br />Fleet size : 1 <br />Scraper(s) <br />Total job time : <br />9.01 <br />Hours <br />Unit cost : $0.458 <br />/LCY <br />Total job cost: <br />$2,198 <br />County : Mesa <br />Site: 32.5 Road Gravel Pit <br />Permit/job # M-2009-035 <br />Abbreviation : none <br />Filename : M035 -09a <br />Model : Cat 633E Series 2 (2001) <br />