Laserfiche WebLink
2 .05.4 (2 ) (b) <br /> The applicant accepts the Division's reclamation bond li- <br /> ability estimate of $573,610. The applicant will provide a <br /> reclamation bond in the amount of $600,000. It is common for an <br /> applicant to make revisions to its operation plan through the <br /> technical revision process. The "over bonded" amount of $26,390 <br /> will be used for changes in the operation plan that may require <br /> additional reclamation bond coverage. Therefore, the value of the <br /> reclamation bond will not have to be revised each time a revision <br /> is made to the operation plan. <br /> The revision to the mine plan made during May 1992 increased <br /> the applicant's bond estimate by $10,825. The additional amount <br /> was a result of handling additional spoil and the reduction in the <br /> required highwall reduction both for the estimated reclamation cost <br /> for Mining Area 1. The over bonded amount is therefore reduced to <br /> $15,565 ($26,390 - $10, 825 ) . <br /> 2-05-20i May 1992 <br />( <br />