Laserfiche WebLink
i • <br /> 2.05.4 (2 ) (b) <br /> Seed and Mulch 80 Acres <br /> It is presented above that the topsoil stockpiles <br /> will cover a total of 49.5 acres. It is also likely that at any <br /> given time 30 to 40 acres have been topsoiled but not seeded and <br /> mulched. For a worst case basis assume 80 acres will need to be <br /> seeded and mulched. <br /> Seeding Rate Seeding Rate <br /> #/Acre #/Acre <br /> Indian ricegrass 2 .50 Utah Sweetvetch 1.00 <br /> Blue grama 0.60 Blue Flax 0.40 <br /> *Needleandthread 1.50 Fourwing Saltbush 0.50 <br /> Galleta 2.40 Winterfat 0.50 <br /> Sand Dropseed 0.05 <br /> Totals 9.45 <br /> Seed Cost per Acre 189.00 <br /> per Mike, Arkansas Valley Seed <br /> Seed and Fertilizer Application 15.00 <br /> • Fertilizer $7 .00 per 50 pounds, 285 #/acre 39.90 <br /> Mulch 2 tons per acre @ $60 120.00 <br /> Mulch Application, power mulch 150.00 <br /> Total Seed and Mulch Cost per Acre 513.90 <br /> USE $525/Acre <br /> Fence <br /> It is assumed that the fence around the reclaimed <br /> area is fairly well caught up with the progression of the mine. <br /> One mile of fence would allow a catch up of 1/4 mile on each side <br /> of the pit in the north south direction and allow the area to be <br /> closed in across the property, about 1/2 mile, in the east west <br /> direction. Assume one mile of three strand barbed wire fence per <br /> mining area at $1.50 per foot. <br /> Following is an estimate of the cost to reclaim the <br /> mine at the time, during the five year permit term, when it is <br /> believed the reclamation liability is the greatest. <br /> • 2.05-19 May 1992 <br />